Setup 47
5.
Make sure the pins on the chassis retention brackets slot into the notches located on both sides of
the chassis.
6.
Install the drives in the front drive cages ("
Installing a hot-plug drive in front drive cage 2
Installing a hot-plug drive in the front drive cage 1
7.
Optional: Install the security bezel ("
8.
Optional: Install the drives in the rear drive cage.
WARNING:
To reduce the risk of electric shock, fire, or damage to the equipment, do not plug
telephone or telecommunications connectors into RJ-45 connectors.
9.
Connect peripheral devices to the server. For information on identifying connectors, see "Rear panel
components (on page
)."
10.
Install the power input module ("
Installing a hot-plug DC power input module
Installing a hot-plug AC power input module
" on page
11.
To prevent accidental power cord disconnection when sliding the server in and out of the rack,
secure the power cord in the strain relief strap attached to the power input module handle:
a.
Unwrap the strain relief strap from the power input module handle.
CAUTION:
To prevent possible server overheating, always populate each processor socket
with a processor socket cover and a processor blank, or a processor and a heatsink.
b.
Secure the power cord with the strain relief strap. Roll the extra length of the strap around the
power input module handle.
Содержание Apollo 4200 Gen9
Страница 38: ...Operations 38 o Two bay SFF hot plug rear drive cage removal o Six bay SFF hot plug rear drive cage removal ...
Страница 154: ...Cabling 154 Front panel cabling Item Description 1 Front I O cable 2 Front USB 2 0 cable ...
Страница 182: ...Support and other resources 182 ...
Страница 183: ...Support and other resources 183 ...