Hardware options installation 90
—
Two-bay SFF rear drive cage – P440 controller Mini-SAS Y-cable connection from the PCIe
expansion slot 5, 6 or 7
12.
For the two-bay SFF rear drive cage only – Install the P440 controller in the riser board slot 3 or 4:
a.
Remove the PCI riser cage (on page
b.
Remove the riser slot cover.
c.
Install the storage controller.
d.
Install the PCI riser cage (on page
e.
Connect the Mini-SAS Y-cable to the rear drive backplane and the storage controller.
Содержание Apollo 4200 Gen9
Страница 38: ...Operations 38 o Two bay SFF hot plug rear drive cage removal o Six bay SFF hot plug rear drive cage removal ...
Страница 154: ...Cabling 154 Front panel cabling Item Description 1 Front I O cable 2 Front USB 2 0 cable ...
Страница 182: ...Support and other resources 182 ...
Страница 183: ...Support and other resources 183 ...