
18
4 220 456 / 02
IMPORTANT NOTICES
12. Installing the upper front (11):
11b
11
11a
Fig. 20
- Install the C-clip (11a) in the cover plate (10 or 10.2)
- Hang the upper front (11) onto the four pins of the
upper side walls (7) so that the pins engage in the
four recesses.
- Fix the upper front to the cover plate (10 or 10.2)
using C-clip (11a) and carriage bolt (11b) (see also
13. Installing siphon and condensate drain (12) (see
chapter “4.4.2 Installation of the siphon and conden-
!
WARNING
The supplied siphon must be installed (ver-
tically).
14. Hang the climbing aid on the previously installed wall
bracket (see Fig. 09 and Fig. 10).
15. Installing the base cladding:
14
13
13
Fig. 21
- Installing both base strips (13) on the sides:
Screw the side base strip (13) onto the boiler feet.
- Installing the front base strip (14):
Place the slots of the front base strip (14) on the cor-
responding screw heads on the side base strips (13)
and then fix all three base strips together by pushing
the front base strip (14) downwards.
16. Installing the front cover (15):
Hook front cover into the lower side walls.
15
Fig. 22
Содержание 51-UltraGas 2 1000
Страница 65: ...65 4 220 456 02 ...