12
4 220 456 / 02
IMPORTANT NOTICES
2.2
Installation of the thermal insulation
1. Place the insulation mat (1) around the UltraGas
®
2 boiler.
- Start at the front of the boiler.
-
Make sure that the recesses are seated correctly.
2. Fit tension springs (2) to hold the ends of the insulation mat (1) together.
3. Fasten plastic straps (3) and strap fasteners (4).
- Do not overtighten the straps (reduced insulating value).
2
1
3
4
Fig. 08
2.3
Installation of the cladding
Содержание 51-UltraGas 2 1000
Страница 65: ...65 4 220 456 02 ...