13
4 220 456 / 02
IMPORT
ANT
NOTICES
2.3
Installation of the cladding
Cladding sections UltraGas
®
2 (125-1100) in installation sequence
1.1/1.2
Cable duct
2
Side wall bottom
3
Terminal plate
4
Electrical box
5
Rear wall bottom
6.1/6.2
Rear wall centre
7
Side wall top
8.1/8.2
Rear wall top
8.3
Blind cover for rear wall top
9
–
10
Cover plate
11
Front top
12
Siphon and condensate drain (see chapter 4.4.2)
13
Base strip on the side
14
Base strip on the front
15
Front cover
Cabling
a
Flue gas sensor (on the back of the boiler, directly under
the return connection)
b
Neutralisation unit (if fitted)
c
Water pressure sensor
d
Mains cable
e
Pressure switch B18
f
Flame monitoring (ionisation)
g
Boiler temperature sensor
h
Burner wiring: 2 plug connections
Fig. 09
a b
c
d
h
g
e f
2
2
4
5
6.1
6.2
8.1
8.2
8.3
7
7
10
11
15
14
13
13
3
11b
11a
1.1
1.2
1.1
1.2
Содержание 51-UltraGas 2 1000
Страница 65: ...65 4 220 456 02 ...