
6. If leaks are found on the compression nuts, depressurize the unit and slightly tighten the leaking
compression nut.
7. Retest until a leak-free installation is verified.
8. Once UV unit is leak-free, the quartz sleeve installation is complete and the UV lamp can be installed.
Note: To remove tube from fitting, first remove the C-clamp then push fitting sleeve down.
Once the fitting sleeve is down, pull the tube out of the fitting.
Install Lamp
Perform this procedure only after the quartz sleeve installation and leak-tests are completed successfully
1. Connect the UV lamp to the 4-point receptacle. If the lamp is not installed properly, lamp breakage
will occur.
2. Insert lamp into quartz sleeve through compression nut pass-thru.
3. Install rubber boot over compression nut.
4. Connect unit power cable to power source.
5. Tighten the 4 screws to secure ballast box cover.
6. Turn ON the power to the unit.
7. Verify UV lamp operation from the viewport.
8. Allow one minute for the UV lamp to warm up prior to flowing water through the UV unit.
Caution: Use the viewport to verify the proper operation of the UV lamp.
Caution: Rapid successive cycling of the power to the ballast can cause premature failure
of the unit.
Caution: Prior to energizing the lamp, make sure there is no water leaking from the quartz
sleeve compression nuts.
Mounting the Unit
Once the UV unit is assembled and tested successfully, it can be mounted onto its permanent
operational location. The unit must be mounted in a manner that will prevent excessive vibration and
warping which will damage the quartz sleeve.
Operational Notes
• Release the pressure in the UV treatment chamber before breaking the compression nut seals.
• Disconnect all power to the UV unit before servicing.
• Do not allow the inlet water temperature to drop below 35ºF (2ºC).
• Do not allow the flow rate to exceed 2 GPM.
• Do not cycle the UV unit more than 3 "ON/OFF" cycles in a 24-hour period.
• Ensure all plumbing connections are tightly sealed before applying pressure.
• Before connecting the return tube, flush the unit to rinse out any debris left from the installation
process.
39
Installation
Содержание Seafari Escape 200
Страница 2: ......
Страница 6: ......
Страница 10: ......
Страница 28: ......
Страница 48: ...________________________________________________________________________________ Seafari Escape 200 600 48...
Страница 73: ...3 8 1 9 2 7 5 4 3 6 Seafari Escape 200 600 74...
Страница 75: ...2 5 7 6 3 4 8 1 6 4 8 3 Seafari Escape 200 600 76...
Страница 77: ...8 4 1 5 3 7 3 2 6 9 4 10 11 Seafari Escape 200 600 78...
Страница 89: ...7 8 6 4 1 3 1 2 4 9 5 Seafari Escape 200 600 90...
Страница 91: ...9 3 6 7 8 10 4 1 1 4 5 5 2 Seafari Escape 200 600 92...
Страница 93: ...13 3 10 11 14 12 8 4 6 7 9 5 1 7 9 2 Seafari Escape 200 600 94...
Страница 95: ...10 18 9 6 15 5 8 16 17 7 14 3 1 20 2 4 11 13 Seafari Escape 200 600 96...
Страница 103: ...5 6 2 3 2 6 7 9 9 8 1 10 5 Seafari Escape 200 600 104...
Страница 110: ...15 9 13 26 12 22 4 20 17 11 6 9 15 9 15 18 10 15 5 3 10 14 16 21 8 25 1 23 19 24 7 2 12 26 111 Exploded Parts View...
Страница 113: ...12 8 9 2 10 13 1 3 5 4 14 11 6 15 7 Seafari Escape 200 600 114...
Страница 116: ...1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 20 19 17 18 117 Exploded Parts View...
Страница 122: ......
Страница 123: ......
Страница 124: ......
Страница 125: ......
Страница 126: ......