
TECHNICAL DATA AND INFORMATION
Information for general use
Rev. M / 73023639
250
GasLab Q2
11.4.
Notes on device characteristics and operating conditions
GasLab Q2 system
Values and/or comments
Place of use
Installation close to the sampling point up to Ex Zone 1 at
atmospheric pressure, gas outlets with no back pressure.
Breather line
Connection at breather element
: 1/4” NPT
Housing
dimensions
L = 38cm
≙
14.96
′′
, W = 27cm
≙
10.63
′′
, H = 23cm
≙
9.06
′′
Weight
16kg
≙
36 lb
Installation gaps:
At least 300 mm to the left and right, at least 200 mm
≙
7.87
′′
at the
top and bottom (recommended 900 x 900 mm
≙
35.43 x 35.43
′′
)
Appr. Heating time
20 min at 20°C
≙
68°F
≙
293 K / 1 hour at -25°C
≙
−13°F
≙
248 K
Interval settings
1 week for operational calibration
1 year for service calibration
Operating system
Service PC: See download section
Software
EnSuite
File format
enSuite.csv/enSuite.par
Data logger
Integrated (interval adjustable)
Communication
Speed:
345,600 Baud TCP/IP (serial)
EMC strength
Electrostatic discharge to IEC 61000-4-2 [25]
Mechanical
strength
Vibration to IEC 60068-2-64 [20]; IEC 60068-2-47 [19]
Level of dirt
of the macro environment: 4