85
Operation
Activate The Waterblasting System And
Set Waterblasting Pressure
1. With the truck in Operate Mode and the en-
gine at idle, make sure the clean water supply
valve is open and the Hog Arm is in the full
up position.
2. Turn the Charge Pump switch ON and monitor
the charge water pressure gauge. Charge wa-
ter pressure should rise to 60 psi (4 Bar) within
10 seconds. If no pressure or a lower pressure
is indicated, there is a problem that must be
corrected before operations can continue.
3. With the charge pump activated, check the
water flow at the stuffing boxes. A steady
stream of water should be flowing to cool and
lubricate the packing. Adjust the metering
valves if necessary.
4. Turn the 40K Clutch switch ON to activate the
ultra high pressure pump and the vacuum
blower.
5. Make sure all personnel are well clear of the
blasting heads, then press the START but-
ton on the joystick control panel to close the
diverter valve and activate high pressure at
the spray bars.
NOTICE:
THE DuMP vALvE TOGGLE SWITCH ON THE SKIP SPEED
REMOTE CONTROL MuST BE ON BEFORE THE START
BuTTON WILL CLOSE THE DIvERTER (DuMP) vALvE AND
SuPPLY HIGH PRESSuRE WATER TO THE SPRAY BARS.
6. Activate the truck cruise control. Use the Ac-
cel/Deaccel switch to slowly increase engine
RPM to achieve the desired operating pres-
sure setting (1000 RPM minimum - 1400 RPM
maximum). There may be some variation in
minimum and maximum RPM depending on
the options selected. Use the manual bypass
valve to make final pressure adjustments if
necessary.
NOTICE:
vACuuM PRESSuRE IS TYPICALLY SET WHEN THE ENGINE
RPM IS RAISED TO ACHIEvE THE DESIRED BLASTING
PRESSuRE.
Joystick Control Console With Forward/Reverse Switch,
Truck Speed Dial, Head Rotation Speed Dial, START/STOP
Buttons, Float Switch, Charge Water Pressure Gauge,
UHP Pump Water Pressure Gauge, Joystick & PLC
UHP Pump High Water Pressure Gauge
7. Check the nozzle spray pattern and the spray
bar weep holes for leaks.
8.
Check all high pressure hose fittings and the
Hog Head for leaks.
Содержание Stripe Hog SH8000
Страница 1: ...Operations Manual...
Страница 2: ...2...
Страница 6: ...6 NOTES...
Страница 16: ...16 NOTES...
Страница 80: ...80 NOTES...
Страница 166: ...166 NOTES...
Страница 171: ...171 Troubleshooting UHP POWER FRAME...
Страница 172: ...172 Troubleshooting...
Страница 173: ...173 Appendix 2 Tools Spare Parts...
Страница 174: ...174 Tools Spare Parts...
Страница 175: ...175 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Страница 176: ...176 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 61...
Страница 178: ...178 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 63 Spray Bar Configuration Charts...
Страница 179: ...179 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 64...
Страница 180: ...180 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 65...
Страница 181: ...181 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 66...
Страница 183: ...183 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 68 Nozzle Calculation Sheet...
Страница 184: ...184 NOTES...
Страница 191: ......