81
3.1 Start Up/Shutdown Introduction
Before operating the Stripe Hog check the fluid
levels in the truck engine, transmission, OMSI
gearbox and hydraulic system. A thorough un-
derstanding of the component systems and their
operation is essential to the proper operation of
the Stripe Hog. Never allow inexperienced and
untrained personnel to operate the Stripe Hog.
This manual and the associated manufacturers’ in-
formation is provided to enhance your knowledge
of the Stripe Hog. Make sure you have read them
carefully and fully understand the truck and all
waterblasting components and systems in theory
and operation.
To make operation as safe and productive as pos-
sible, it is essential to conduct a thorough pre-
start inspection before operating the machine.
You should walk around the unit and visually
inspect the Hog Arm, blasting heads, high pres-
sure hoses, hydraulic hoses, vacuum hoses, and
all waterblasting system components for obvi-
ous signs of leaks, wear and deterioration. The
inspection should be conducted in an orderly and
consistent fashion to ensure all critical points
are inspected each time. Do not operate the unit
until all questionable components are repaired or
replaced.
The startup and shutdown procedures described
in this section are for a typical truck chassis
equipped with an automatic or manual transmis-
sion. This information is provided as a general
guide and overview of the process for educational
purposes. The exact procedure for your truck
may be different, depending on the chassis and
the options selected. Hog Technologies includes
a quick reference placard usually attached to the
drivers side sun visor in the cab, that provides
the proper startup and shutdown procedures for
your specific truck.
NOTICE:
ALWAYS CHECK THE HOG HEAD NOZZLES AND SPRAY BARS
FOR WEAR AND DAMAGE BEFORE EACH SHIFT. REFER
TO HIGH PRESSuRE HOSES AND NOZZLES IN SECTION
2.7 (WATER BLASTING SYSTEMS) FOR INFORMATION ON
INSPECTING SPRAY BARS AND NOZZLES).
Section 3:
Waterblasting Operation
Содержание Stripe Hog SH8000
Страница 1: ...Operations Manual...
Страница 2: ...2...
Страница 6: ...6 NOTES...
Страница 16: ...16 NOTES...
Страница 80: ...80 NOTES...
Страница 166: ...166 NOTES...
Страница 171: ...171 Troubleshooting UHP POWER FRAME...
Страница 172: ...172 Troubleshooting...
Страница 173: ...173 Appendix 2 Tools Spare Parts...
Страница 174: ...174 Tools Spare Parts...
Страница 175: ...175 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Страница 176: ...176 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 61...
Страница 178: ...178 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 63 Spray Bar Configuration Charts...
Страница 179: ...179 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 64...
Страница 180: ...180 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 65...
Страница 181: ...181 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 66...
Страница 183: ...183 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 68 Nozzle Calculation Sheet...
Страница 184: ...184 NOTES...
Страница 191: ......