46
46
Stripe Hog Systems
Filtered air flows out of the filter canister through
the blower and out the silencer. A stainless steel
cutoff ball valve in the vacuum line at the top of
the debris tank automatically shuts off the vacuum
flow if the tank becomes full, protecting the blower
and other vacuum system components.
Consistent and proper airflow is critical to main
-
taining optimum vacuum pressure. The recom-
mended vacuum gauge reading is between -5
(Hg) and -7(Hg). Maximum vacuum of -7 (Hg) is
typically achieved at 1400 RPM (Maximum engine
operating RPM). Vacuum pressure is displayed
and monitored by the operator on the PLC display
located in the cab.
To prevent damage to the vacuum system there
are two vacuum safety relief valves called Kunkle
valves that open if there is insufficient airflow and
consequently excess vacuum in the vacuum sys-
tem. These valves are preset at the factory and
equipped with a data tag that displays the activa-
tion preset pressure in inches of mercury (Hg).
One Kunkle valve is located on top of the debris
tank and the other is on the vacuum filter canister.
For proper operation, these safety valves should
be checked and maintained periodically (Refer
to the maintenance matrix in the maintenance
section of this manual). A full debris tank, debris
buildup, kinks, clogs or leaks in the system will
cause a reduction in airflow at the blasting heads,
reducing the efficiency of operation or causing
operations to stop completely.
Vacuum Canister Safety Relief Valve (Kunkle Valve)
Debris Tank Safety Relief Valve (Kunkle Valve)
Stainless Steel Vacuum Cutoff Ball Valve
PLC Screen Showing Vacuum Pressure Gauge
Содержание Stripe Hog SH8000
Страница 1: ...Operations Manual...
Страница 2: ...2...
Страница 6: ...6 NOTES...
Страница 16: ...16 NOTES...
Страница 80: ...80 NOTES...
Страница 166: ...166 NOTES...
Страница 171: ...171 Troubleshooting UHP POWER FRAME...
Страница 172: ...172 Troubleshooting...
Страница 173: ...173 Appendix 2 Tools Spare Parts...
Страница 174: ...174 Tools Spare Parts...
Страница 175: ...175 Appendix 3 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM...
Страница 176: ...176 Daily Report Pre Op Checklist 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 61...
Страница 178: ...178 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 63 Spray Bar Configuration Charts...
Страница 179: ...179 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 64...
Страница 180: ...180 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 65...
Страница 181: ...181 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 66...
Страница 183: ...183 Spray Bar Nozzle Configuration 1 877 HOG ROAD WWW STRIPEHOGSUPPORT COM 68 Nozzle Calculation Sheet...
Страница 184: ...184 NOTES...
Страница 191: ......