CTC-CEN Service Manual 07-13 Rev.E
81
Remove the two tangs from the gearbox shaft
Unlock the last two screws the secure the gearbox to the cabinet.
Unscrew the two screws that secure the gearbox inside of the cabinet.
Remove the remaining two screws and nuts to complete the gear box dismounting.
BE CAREFUL! THE GEARBOX IS HEAVY AND IT COULD CRUCH A HAND.
Remove the pulley from the gearbox and mount it to new one.
Mount the new gear box with two rear screws and two nuts to the front. Do not tighten firmly the screws and the
nuts.
Place the two tangs on the gearbox shaft.
Mount the centerpost. Make sure that the tangs will remain in place.
Mount the centerpost. Secure it firmly with the screws and the nuts.
Mount the belt and adjust it.
Check if the machine works fine.
Mount the front protection.
8.5 BEAD BREAKER DISCS # EAM0065G63A: CHECK AND REPLACEMENT
:
30’ each one
:
End keys 8 and 17mm, allen keys 3,4,5 and 6mm, 13mm tube type key, electronic inclinometer.
:
Defective bead breaker discs may cause the following malfunctions:
1. Low bead breaking efficiency.
2. Difficult bead breaking operation.
3. Excessive play on the disc.
4. Incorrect bead breaker arm alignment.
TO CHECK THE DISC:
Mount a wheel slightly inflated at 1 bar to the centre post.
Position the bead disc close to the tire and lock as a normal operation.
Lower the bead breaker disc to press the tire: if the disc will go on the rim there it has excessive play and must
be replaced.
Check also if the disc is damaged.
Содержание ATC 900
Страница 2: ...CTC CEN Service Manual 07 13 Rev E 2 B L A N K P A G E ...
Страница 7: ...CTC CEN Service Manual 07 13 Rev E 7 ELECTRIC DIAGRAM ...
Страница 8: ...CTC CEN Service Manual 07 13 Rev E 8 PNEUMATIC DIAGRAMS ...
Страница 117: ...CTC CEN Service Manual 07 13 Rev E 117 300KPa 25KPa 400KPa 25KPa ...
Страница 119: ...CTC CEN Service Manual 07 13 Rev E 119 B L A N K P A G E ...