
38
Commissioning
COMMISSIONING
•
Before commissioning the device, read the safety
information as of page 10 onwards.
•
A functional test must be carried out before every
commissioning (see page 89).
•
Before commissioning the ventilation system (ventila-
tor, tube, humidi
fi
er, etc.), check all connections for
leaks, as well as the stability of the connected acces-
sories.
•
Never operate the device without the air
fi
lter.
•
Only use original HOFFRICHTER
fi
lters.
If the device was previously in an environment where the air temperature
was very different from the operating location, you should wait approximately
1/2 an hour before commissioning until the temperatures have evened out.
SETTING UP THE DEVICE
Place the device on a
fl
at and stable surface. The device can also be oper-
ated in an upright position, whereby care should be taken that the air inlet
at the rear of the device and all ventilation slots are not blocked.
Содержание TRENDvent
Страница 103: ...Notes 103 NOTES ...