A2B
© PRS 40 EZ REV A 03/16/06
190201_A
13
Fig. 1
:
Setting of Anti Two-Block Retainer in Locking
Position
Fig. 2
:
Retainer in Locking Position
3. Straighten the cable completely into the slot and release the cable (4).
4. Turn the flag of the retainer for best visibility for the operator (5).
Removal and Storage of the Anti Two-Block Retainer Procedure (see Fig. 3 and 4):
1. Pull the cable out of the switch (1) and bend back parallel to the boom and hold (2).
2. Move the retainer down (3) and then left (4) to remove it from the Anti Two-Block switch. Release
the cable.
3. For storage slide the retainer from right side (5) over the Anti Two-Block switch until the clips (A)
lock into the holes (B).
Fig. 3:
Removal of the Anti Two-Block Retainer
Fig. 4:
Retainer in Storage Position
(WIRED APPLICATION)
After the electrical connections have been checked to insure that the system is properly connected for
the crane configuration, the following checks shall be made:
1. Check the electrical wiring connecting the various parts of the system for physical damage.
2. Check the anti two-block switches and weights for free movement.
Содержание PRS 40 EZ
Страница 1: ...HIRSCHMANN P N 031 300 190 201 Revision A 03 16 2006 PRS 40 EZ OPERATOR S SERVICE MANUAL...
Страница 2: ......
Страница 4: ......