9
T-CONTROL
20
9
T-CONTROL
The handling and menu navigation are described in this chapter. Every single T-CONTROL parameter is
explained in chapter 9.11.
Figure: T-CONTROL
9.1
Starting the system
To switch on the display, two conditions must be fulfilled:
◼
The boiler must be connected to the power supply (see figure below)
◼
The main switch (1) on the boiler front must be switched on (see figure)
If these two conditions are fulfilled, the starting process of the display, which takes 1-2 minutes, starts.
Boiler main switch (only firematic 120
–201)
1
Содержание firematic PELLET 120
Страница 1: ...OPERATING INSTRUCTIONS Wood chips pellets heating system firematic PELLET 120 201 ...
Страница 19: ...Temperature manager 8 19 Fig 8 6 Example temperature manager when time mode without difference ...
Страница 84: ...15 Annex 84 15 ANNEX 15 1 Additional boiler module Hydraulic recommendation 1 ...
Страница 85: ...Annex 15 85 Hydraulic recommendation 2 ...
Страница 86: ...15 Annex 86 15 2 Solar module Program 1 ...
Страница 87: ...Annex 15 87 Program 2 ...
Страница 88: ...15 Annex 88 Program 3 ...
Страница 89: ...Annex 15 89 Program 4 ...
Страница 90: ...15 Annex 90 Program 5 ...
Страница 91: ...Annex 15 91 Program 6 ...
Страница 92: ...16 Notes 92 16 NOTES ...
Страница 93: ...Notes 16 93 ...