505 VAC, 50/60 Hz. The T2 input voltage can range from 198
VAC to 280 VAC. An optional 1 kVA step-down transformer may
be purchased if a separate 240 VAC source is not available.
Refer to page three of the DX-25U Cabinet Outline Drawing for
recommended wire and fuse size for the three phase 105 kVA
feed.
NOTE
THIS EQUIPMENT IS DESIGNED FOR CONNECTION TO A
WYE OR CLOSED DELTA THREE-PHASE POWER SOURCE.
EACH AC POWER FEED IS TO HAVE ITS OWN SEPARATE
DISCONNECT.
2.8.3
Interconnection Wiring
Refer to Sheet 1 of the DX-25U Overall Schematic, 839-7855-
151, and Table 2-3 for interconnect information between the
cabinets and Step Start panel. Wires 154, 155, 156, 121, 519, 96,
and 97 are part of the wiring harness in the PA Cabinet.
The Installation Kit, 992-8102-001, provides an assortment of
wire and lugs to be used between 3TB1 of the Step Start panel
and TB3 of the PA Cabinet. Enough wire is provided for a conduit
run of approximately 60 feet (18.29 meters). See drawing 3A-10
for component lay out.
The electrical interconnection between the Step Start Panel and
the PA Cabinet should be made by using conduit runs into the
top of the transmitter. Access is available through the bottom of
the transmitter for use of a wire trough. If conduit is used, 3 runs
are needed: One for the 105 kVA 3 phase feed, one for the 1 kVA
single phase feed and one for the step start control cables. The
control cables should be kept separate from any AC input to the
transmitter cabinet. Refer to Sheet 3 of the DX-25U Cabinet
Outline drawing, 839-7855-152, for drawing details of these runs
and the location of the interconnect points.
2.8.4
Transformer Tap Settings
Tapping information for T1 and the blowers will be found on
Table 2-2, wire and fusing information will be found on Sheet 3
of the DX-25U Cabinet Outline drawing, 839-7855-152. Tap-
ping information for Low Voltage Supply transformer T2 is silk
screened on the center door and labeled on the transformer.
NOTE
If the line voltage falls between the 4% taps or sags when going
from no load to full load, tap T1 down to the next voltage combi-
nation to avoid unnecessary tripping of the Over Voltage Over-
load during initial turn on.
2.9
Component Installation
Some components have been removed for shipment, and will
have to be reinstalled. These components include the PA Com-
biner Output Bar and cover and Grounding Plate. Under some
shipping conditions, Output Network capacitors may have been
removed. For the following information, refer to Sheet 4 of the
Overall Schematic, 839-7855-151, and Sheet 1 of the Cabinet
Outline drawing, 839-7855-152.
2.9.1
PA Combiner Output Bar
Slide the PA Combiner Output Bar through the feed-through
between the PA Cabinet and Output Network Cabinet. Fasten the
bar between the Combiner and L1 in the Output Network using
1/4-28 hex screws and lock washers. Make sure the hardware is
securely tightened.
Next, slide the Output Bar Cover over the Output Bar. Make
sure no packing material is left inside the cover. Secure it
using 10-32 screws, flat washers, and split washers. Install the
RF Sample Assembly (T6) on top of the cover with 6-32
screws, flat washers, and split washers. Use the silkscreen on
the back of the rear access panel as a guide to ensure that the
assembly is installed in the correct direction. Wire #96 should
be connected to T6.
After the RF Sample Assembly is installed on the Output Bar
Cover, fasten the two Close-Out Panels over the feed-through
openings. One is mounted on the PA Cabinet side and the other
is mounted on the Output Network Compartment side.
2.10
Transmitter Grounding
The PA and Output Network Cabinets must be grounded in
addition to grounding the Step Start panel. The transmitter must
be grounded to the station ground system with copper strap at
least two inches wide and 0.020 inch thick connected to 2E1 in
the Output Network Cabinet. A two inch strap connects 2E1 in
the Output Network Cabinet with E1/E2 of the PA Cabinet.
All grounding points in the transmitter have a brass block to make
grounding connections. Grounding connections external to the
transmitter should be brazed.
Figure 2-1
K2 in step-start panel connections.
DX-25U
2-4
888-2297-002
Rev. AA: 8/9/2000
WARNING: Disconnect primary power prior to servicing.
Содержание DX 25U
Страница 2: ......
Страница 10: ......
Страница 28: ......
Страница 32: ......
Страница 46: ......
Страница 58: ......
Страница 82: ......
Страница 150: ......
Страница 158: ......
Страница 166: ......
Страница 174: ......
Страница 176: ......
Страница 196: ......
Страница 206: ......
Страница 212: ......
Страница 218: ......
Страница 270: ......