Chapter 2 – Installation
Hardy Process Solutions HI 6200 Weigh Processor User Guide
15
Reviewing the power and the heating, ventilation, and air-conditioning (HVAC)
requirements, and then ordering any additional support equipment.
Making a final layout of the installation and reviewing the layout with Hardy Field Service.
Verifying that the electrical service wiring has been installed at the predetermined location
before installing the HI 6200.
To aid with your pre-installation planning, verify the availability of each item in the following
site preparation checklist. The following tasks might require several weeks to complete:
Acquiring required power outlets.
Arranging for an electrician.
Adding or modifying air conditioning systems.
Making room alterations to accommodate the HI 6200.
Ordering third-party equipment to support the HI 6200.
Checklist Question
Yes
No
Safety
Is the installation location room free of any equipment servicing hazards, such as electrical
or data cables that obstruct access?
Does the installation location have a fire-protection system?
Space Planning
Are there cutouts or channels to route cables?
Can the temperature be maintained between -20°C to 55°C (-4°F to 131°F) during
operations?
Can the humidity level be maintained between 0% and 90% non-condensing?
Is the installation location protected against dust, pollution, and metallic particulate
contamination?
Does the installation location take into account environmental considerations, such as
vibration and acoustics?
Is all equipment not supplied by Hardy Process Solutions (for example, power supply) on
site and ready for use?
Electrical Requirements
Is there a sufficient number of AC outlets for the equipment?
Are the AC outlets on different lines?
Are the input circuit breakers adequate for equipment loads?
Are uninterruptible power supplies (UPS) in place?
Have all sources of electrical interferences been addressed?