Designation
Core colour supply line
Marking terminal block
Live conductor phase 1
BROWN
L1
Live conductor phase 2
BLACK
L2
Live conductor phase 3
GREY
L3
Neutral
BLUE
N
Protective conductor
GREEN-YELLOW
PE
DANGER!
The previously mentioned colour coding is
NOT international binding
: If
the individual wires in the supply cable are color-coded differently, contact a
qualified electrical specialist company! Have the supply line checked and
replaced if necessary.
5
Now set the circuit breakers of the cPH2 charging station (switch position I ON).
6
Reattach the housing cover to the cPH2 charging station.
6.1
Reconnect the plug for the LED indicators and insert the Touch protection
cover in.
6.2
Hook the housing cover back onto the charging station from above.
6.3 Hand-tighten
the two screws on the lower side of the housing cover.
7
Finally, activate the back-up fuses installed in the supply line.
The LED indicators should now light up green.
This completes the electrical installation of your charging station.
After the mechanical and electrical installation, your charging station is ready for
operation.
Installation and operating manual
cPH2
charging station
Version: 1.0.9
17