Installation and taking into operation
The installation has to be carried out principally by professional staff.
Approval has
to be given by a qualified electric company before the charging station can be
taken into operation for the first time.
Your cPH1 charging station is an electrotechnical device and therefore has to follow
certain demands concerning the installation indoors and outdoors: Even though the
housing of the cPH1 fullfills the standards given by IP44, please note especially for
outdoors various environmental conditions:
•
To ensure safe operation comply with minimum distances to other technical
constructions. Further information can be obtained upon asking your
distributor or deployed qualified staff of the electrical installing company.
•
The charging station has to be installed in places easily accessible to
persons authorized for usage.
•
Choose the place of installation accordingly so the charging cable of the
cPH1 can reach the charging socket of your electric vehicle without any
further problems. UNDER NO CIRCUMSTANCES should the cable be
strained with tensile strength while it is connected with your EV.
Mechanical installation on wall
Additionally the following components will be required:
•
An electric drilling machine or a cordless screwdriver (not included in scope
of delivery)
•
A twist drill Ø 10 mm for the respective mounting surface (not included in
scope of delivery)
•
A Torx-Screwdriver or
Torx-Bit
TX
25 and TX40 (
not included in scope of
delivery
)
•
Four ASSY-D plug screws of size 8,0-70/60; partial threads with matching nylon
screw anchors of size
10×56 mm (
included in scope of delivery)
•
two cylinder head screws of size M5×16 (
included in scope of delivery
)
•
if necessary: a level (not included in scope of delivery)
Instruction Manual
cPH1
charging station
Version: 1.2.4
15