![Hamilton Jet HJ212 Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/hamilton-jet/hj212/hj212_installation-and-service-manual_3417629005.webp)
Fixing the Intake Block to the Hull ______________________________________ 5-2
Transom Preparation ________________________________________________ 5-2
Equipment Preparation ____________________________________________________ 5-3
Steering Components ________________________________________________ 5-3
Reverse Components ________________________________________________ 5-3
Mounting the Jet Unit _____________________________________________________ 5-3
Preparation ________________________________________________________ 5-3
Mounting the Jet Unit ________________________________________________ 5-4
Fix the Transom Plate to the Hull _______________________________________ 5-4
Installation Checks for the Jet Unit _____________________________________ 5-4
Final Assembly _____________________________________________________ 5-6
Driveline and Engine Installation _______________________________________ 5-6
Engine Cooling ____________________________________________________ 5-10
Engine Systems ____________________________________________________ 5-10
Exhaust Systems ___________________________________________________ 5-10
Optional Impeller Installation _________________________________________ 5-10
Installation of Control Equipment ___________________________________________ 5-10
Reverse Latch Assembly _____________________________________________ 5-11
Reverse Cable _____________________________________________________ 5-11
Zero Speed Detent _________________________________________________ 5-12
Steering Installation ______________________________________________________ 5-13
Steering Wheel Number of Turns ______________________________________ 5-13
Tiller Stop Fitting and Adjustment _____________________________________ 5-13
Cable Pulley System ________________________________________________ 5-14
Push-Pull Cable System ______________________________________________ 5-14
Transom Preparation _______________________________________________ 5-14
6 - Commissioning ____________________________________________________ 6-1
Pre-Launch Checks ________________________________________________________ 6-1
Post Launch Checks _______________________________________________________ 6-2
Engine Running Checks (Vessel Moored) ______________________________________ 6-2
Vessel Speed and Handling Trials ____________________________________________ 6-3
After Initial Trials (After Engine Shutdown) ____________________________________ 6-3
Содержание HJ212
Страница 1: ...HJ212 Installation and Service Manual R3A3 Jet unit Manual ...
Страница 20: ...Product Description Installation and Service Manual 2 6 ...
Страница 56: ...Commissioning Installation and Service Manual 6 4 ...
Страница 62: ...Fault Finding Installation and Service Manual 7 6 ...
Страница 82: ...Maintenance Installation and Service Manual 8 20 ...
Страница 137: ...Installation and Service Manual Appendix Notes 10 21 ...
Страница 141: ...Installation and Service Manual Appendix Notes 10 25 ...
Страница 164: ...Appendix Installation and Service Manual 10 48 ...
Страница 166: ......
Страница 169: ......
Страница 171: ......
Страница 172: ......
Страница 174: ...5 4 13 5 4 1307 0 3 453 5 4 4 4 05 50 64 8 53 5 50 5 5 3 454 0 8 50 0 5 54 3 5 0 5 8 50 0 5 11307 4 P 4 3 8 5 ...
Страница 175: ......
Страница 176: ......
Страница 177: ......
Страница 178: ......
Страница 181: ......
Страница 185: ......
Страница 186: ......
Страница 188: ......
Страница 195: ......
Страница 196: ......
Страница 197: ...Notes ...