° °
°
° °
°
W
*HYK°*!°7YLWHYH[PVU°VM°[OL°(S\TPUP\T°7L[YP+PZOLZ
HUK(IZVYILU[°7HKZ
C
Carefully pour the media from the MMD
on to the absorbent pad in the petri dish.
Dispense absorbent pad into petri dish by
sliding the grooved lever of the dispenser.
Replace petri dish lid to keep contents
sterile and free from contamination.
Remove lid of sterile petri dish taking
care only to handle the lid by the sides.
Ensure the absorbent pad is saturated with
a small excess of media at the edges.
Remove the lid from the tube of absorbent
pads and attach to the pad dispenser.
C1
C2
C3
C4
C5
C6
44
Содержание Wagtech Palintest Potatest Go
Страница 1: ...Potatest Go Rapid Response Portable Water Quality Laboratory ZI PTW 10005 ...
Страница 48: ...www palintest com ...