GST100 Intelligent Fire Alarm Control Panel
Installation and Operation Manual
Page 9
Chapter 4 Installation and Commission
4.1 Checking
Please check the following items of the FACP before installation.
Check project configuration
Check the configuration according to packing list. The main items are: Installation and
Operation Manual, and keys to the FACP, etc.
Check internal configurations and interconnections
The FACP is installed and wired with all parts (including optional parts specially ordered) at
the factory. Please check the connection of all the parts, including connection of main board
with LED/key board, LED/key board with interface board, and speaker with LED/key board.
Please refer to Appendix 1 Internal connection diagram.
4.2 Installation
Mounting Method: Wall mounted
Mounting Hole Distance: 160mm
Operating Temperature: 0
℃~
+40
℃
Relative Humidity
≤
95%, non condensing
4.3 Power-up Self-test
After the FACP is installed, power it up for self-test to see
If the LCD is normal;
If all LED indicators are able to illuminate;
If the speaker can give different kinds of obvious loud alarming sounds, and
Observe if there
’s trouble with the power supply and if the keypad gives tick-tick sound
after entering normal monitor state.
4.4 Connections of Periphery Devices
Warning: After power-up self-test, please disconnect the power before connecting
periphery devices!
Terminals of the FACP are shown in Fig. 4-1. Please refer to Appendix 1 for the position of
terminals on the PCB.
Interface board: