![GSi TopDry Autoflow Скачать руководство пользователя страница 89](http://html1.mh-extra.com/html/gsi/topdry-autoflow/topdry-autoflow_construction-manual_2275071089.webp)
Chapter 7: TopDry Drying Floor
Center Cone Assembly
Before You Begin
Make sure that the chute chains are adjusted before installing the center cone assembly.
What You Should Know
The center cone assembly comes as separate sections.
1. Install the center cone sections (A) together using 1/4 x 5/8 in. bolts (B) and 1/4 in. nuts (C) to form
the center cone assembly.
Figure 7-27
Center cone assembly
A
Center cone section (TD-1SG746)
D
Flat overhead view
B
1/4 x 5/8 in. bolt
E
Formed overhead view
C
1/4 in. nut
F
Assembled view
PNEG-4936
36 Ft. TopDry Autoflow
89
Содержание TopDry Autoflow
Страница 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Страница 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Страница 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Страница 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Страница 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...
Страница 140: ...NOTES 140 PNEG 4936 36 Ft TopDry Autoflow...