![GSi TopDry Autoflow Скачать руководство пользователя страница 110](http://html1.mh-extra.com/html/gsi/topdry-autoflow/topdry-autoflow_construction-manual_2275071110.webp)
Assembling the Chain Guard
1. Position the chute controller assembly so that all sides are accessible. Remove the cover from the
chute controller housing.
2. Align the top and bottom tabs of the rear chain guard (B) with holes in the idler sprocket mounting
brackets (C) and attach by inserting 5/16 x 3/4 in. flange bolts (D) through the sides and tightening
with 5/16 in. flange nuts (E).
3. Feed chain (A) from the large sprocket around the small sprocket and out through the back panel
and up between the idler sprocket mounting brackets (C).
4. Install the rear chain guard (B) and controller cover to secure for lifting.
Figure 9-4
Assembling the chain guard
A
#40 roller chain (TD-101357)
D
5/16 x 3/4 in. flange bolt (S-6606)
B
Rear chain guard (TD-101336)
E
5/16 in. flange nut (S-3611)
C
Idler sprocket mounting bracket (TD-101332)
110
PNEG-4936
36 Ft. TopDry Autoflow
Содержание TopDry Autoflow
Страница 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Страница 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Страница 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Страница 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Страница 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...
Страница 140: ...NOTES 140 PNEG 4936 36 Ft TopDry Autoflow...