![GSi TopDry Autoflow Скачать руководство пользователя страница 79](http://html1.mh-extra.com/html/gsi/topdry-autoflow/topdry-autoflow_construction-manual_2275071079.webp)
Chapter 7: TopDry Drying Floor
Assembling the Outside Cable Pulley
1. Position the large pulley bracket (F) 9-3/8 in. (23.8 cm) horizontally from the center of the stiffener
(L).
NOTE:
When positioning the pulley (A), ensure the pulley cable does not interfere with the chutes.
This can only be accomplish at every other stiffener (L).
2. Field drill four 3/8 in. diameter holes (K) in the second ring 12 in. (O) from the center of the hole on
the horizontal seam.
3. Install the pulley brackets (F and G) to the sidewall using 5/16 x 1 in. flange bolts (H) and 5/16 in.
hex nuts (I).
NOTE:
Make sure that the flange bolt (H) is installed from the inside of the bin.
4. Field drill 1/2 in. hole (J) into the sidewall to allow the cable to pass through.
5. Install the pulley (A) between the pulley brackets (F and G) with 3/8 x 1-7/8 in. shoulder bolt (C),
3/8 in. sealing washer (D) and 3/8 in. hex nuts (E).
PNEG-4936
36 Ft. TopDry Autoflow
79
Содержание TopDry Autoflow
Страница 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Страница 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Страница 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Страница 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Страница 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...
Страница 140: ...NOTES 140 PNEG 4936 36 Ft TopDry Autoflow...