![GSi TopDry Autoflow Скачать руководство пользователя страница 105](http://html1.mh-extra.com/html/gsi/topdry-autoflow/topdry-autoflow_construction-manual_2275071105.webp)
Installing the Perforated Center Band
The perforated center band is used to avoid the grain flow over the inner levelling band while filling.
What You Should Know
The perforated center bands (B) do not attach to the leveling bands but hang from the roof panel on the
inside of the top inner leveling band.
1. Measure down (F) from the first hole in the roof panel ribs (E) and mark the location.
2. Field drill 3/8 in. diameter holes in the roof panel rib, equally spaced, for the top band clips (A).
3. Install the band clips (A) on the roof panels (E) with the 5/16 x 1 in. flange bolts (C) and 5/16 in. hex
nuts (D).
4. Install the perforated center bands (B) on the band clips (A) with the 5/16 x 1 in. flange bolts (C) and
5/16 in. hex nuts (D).
5. Connect the perforated center bands (B) together with the 5/16 x 1 in. flange bolts (C) and 5/16 in.
hex nuts (D).
Figure 8-12
Installing the perforated center band installation
A
Band clip (TD-100107)
D
5/16 in. hex nut (S-396)
B
Perforated center band (TD-1SG226)
E
Roof panel
C
5/16 x 1 in. flange bolt with sealing washer (S-10260)
F
30 in.
PNEG-4936
36 Ft. TopDry Autoflow
105
Содержание TopDry Autoflow
Страница 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Страница 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Страница 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Страница 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Страница 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...
Страница 140: ...NOTES 140 PNEG 4936 36 Ft TopDry Autoflow...