![GSi TopDry Autoflow Скачать руководство пользователя страница 113](http://html1.mh-extra.com/html/gsi/topdry-autoflow/topdry-autoflow_construction-manual_2275071113.webp)
Attaching the Cable to the Turnbuckle
Before You Begin
WARNING
Disconnect and lock-out power before performing installation.
Perform limit switch testing before connecting the cables to the turnbuckle.
1. Remove the front chain guard (A) from the rear chain guard (B).
2. Route the cable from the inside of the bin, through the sidewall sheet, over the chute pulley at the
bin eave, and down to the chain turnbuckle that is connected to the chute controller.
3. Set the turnbuckle (D) to the halfway point to allow for adjustment in both directions.
4. Bolt the turnbuckle to the chain (C).
5. Attach the cable (F) to the turnbuckle using two cable clamps (E).
Figure 9-6
Attaching the cable to the turnbuckle
A
Front chain guard (TD-101335)
D
Turnbuckle
B
Rear chain guard (TD-101336)
E
Cable clamps
C
Chain
F
Cable
PNEG-4936
36 Ft. TopDry Autoflow
113
Содержание TopDry Autoflow
Страница 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Страница 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Страница 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Страница 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Страница 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...
Страница 140: ...NOTES 140 PNEG 4936 36 Ft TopDry Autoflow...