![GSi TopDry Autoflow Скачать руководство пользователя страница 83](http://html1.mh-extra.com/html/gsi/topdry-autoflow/topdry-autoflow_construction-manual_2275071083.webp)
Chapter 7: TopDry Drying Floor
Installing the Leveling Band Post
The leveling band posts are used to install the leveling bands.
What You Should Know
Attach the leveling band posts (A) on the floor sheet (D) in the third, sixth, tenth and twelfth holes of the
rafters starting from the sidewall end.
1. On the third hole of the floor sheet (D), install eighteen leveling band posts (A) (one in every other
sheet) using 5/16 x 1 in. flange bolts (B) and 5/16 in. flange nuts (C).
2. On the sixth and tenth hole of the floor sheet (D), install twelve leveling band posts (A) (one in every
third sheet) using 5/16 x 1 in. flange bolts (B) and 5/16 in. flange nuts (C).
3. On the twelfth hole of the floor sheet (D), install six leveling band posts (A) (one in every sixth sheet)
using 5/16 x 1 in. flange bolts (B) and 5/16 in. flange nuts (C).
Figure 7-21
Installing the leveling band post
A
Leveling band post (TD-100645)
C
5/16 in. flange nut (S-3611)
B
5/16 x 1 in. flange bolt with sealing washer (S-10260)
D
Floor sheet
PNEG-4936
36 Ft. TopDry Autoflow
83
Содержание TopDry Autoflow
Страница 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Страница 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Страница 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Страница 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Страница 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...
Страница 140: ...NOTES 140 PNEG 4936 36 Ft TopDry Autoflow...