Figure 3-1
Scribe the diameter
A
Spike
D
Pointed stake
B
Foundation radius
E
Foundation line
C
2 ft.
F
2 x 4 center stake
Preparing the Foundation Forms
1. Having scribed the diameter of the foundation, proceed by digging the foundation’s footing, which
consists of a large circular trench inside the foundation line.
2. Once the footing has been dug, you are ready to build the forms. The forms must be rigid enough to
hold their shape against the poured concrete.
3. The foundation must be flat. Sloped floors cannot be used in drying bins. A carpenter’s level placed
on top of the compass 2 x 4 constructed earlier will enable you to set the top of the forms to match
the top of the center stake.
4. Check the form work with a transit to ensure a uniform elevation for the entire foundation. The
foundation must be level within 1/8 in. on non-stiffened bins and within 1/4 in. on stiffened bins at bin
wall perimeter. Stiffened bins must be shimmed level. Provisions for unloading system and other
accessories, must be made as required by the particular material handling system used.
NOTE:
All foundation specifications must be construed as recommendations only. Because of the many
variable conditions in an actual installation, manufacturer assumes no liability for results arising
from the use of such recommendations.
28
PNEG-4936
36 Ft. TopDry Autoflow
Содержание TopDry Autoflow
Страница 6: ...NOTES 6 PNEG 4936 36 Ft TopDry Autoflow...
Страница 26: ...NOTES 26 PNEG 4936 36 Ft TopDry Autoflow...
Страница 46: ...NOTES 46 PNEG 4936 36 Ft TopDry Autoflow...
Страница 106: ...NOTES 106 PNEG 4936 36 Ft TopDry Autoflow...
Страница 128: ...NOTES 128 PNEG 4936 36 Ft TopDry Autoflow...
Страница 140: ...NOTES 140 PNEG 4936 36 Ft TopDry Autoflow...