![GSi 40-SERIES Скачать руководство пользователя страница 97](http://html1.mh-extra.com/html/gsi/40-series/40-series_construction-manual_2275090097.webp)
Figure 8-7
A-frame installation sequence and temperature cable locations for 72 ft diameter bin
A
9.3 ft radius location
B
26 ft radius location
Table 8-1
A-frame installation sequence and temperature cable locations for 72 ft diameter bin
A-frame number
Rafter Number
Temp Cable Number
Radius Location
A1
R19
T4
9.3 ft
R20
T11
26 ft
A2
R7
T2
9.3 ft
R8
T7
26 ft
A3
R13
T3
9.3 ft
R14
T9
26 ft
A4
R1
T1
9.3 ft
R2
T5
26 ft
A5
R17
T10
26 ft
R18
—
—
A6
R5
T6
26 ft
R6
—
—
A7
R21
—
—
PNEG-4472
72 Ft Diameter Z-Tek Bins
97
Содержание 40-SERIES
Страница 6: ...NOTES 6 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 18: ...NOTES 18 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 26: ...NOTES 26 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 34: ...NOTES 34 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 72: ...NOTES 72 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 168: ...NOTES 168 PNEG 4472 72 Ft Diameter Z Tek Bins ...