![GSi 40-SERIES Скачать руководство пользователя страница 130](http://html1.mh-extra.com/html/gsi/40-series/40-series_construction-manual_2275090130.webp)
2. Align the holes on the first top panel (E) to the holes in the center collar channel brackets (C) and
the inner center collar channel (D).
3. Install the flange bolts (F) and flange nuts (G) only to the holes at one end to secure the first top
panel (E) with the center collar channel bracket (C).
NOTE:
Leave the flange bolts (F) hand tight to remove it later when tucking the last top panel under
the first top panel.
Figure 8-33
Installing the first top panel
C
Center collar channel bracket (CTR-1580)
F
3/8 x 1 in. flange bolt with sealing washer (S-
7487)
D
Inner center collar (CTR-1581)
G
3/8 in. flange nut (S-9426)
E
Top panel (CTR-1585)
130
PNEG-4472
72 Ft Diameter Z-Tek Bins
Содержание 40-SERIES
Страница 6: ...NOTES 6 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 18: ...NOTES 18 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 26: ...NOTES 26 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 34: ...NOTES 34 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 72: ...NOTES 72 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 168: ...NOTES 168 PNEG 4472 72 Ft Diameter Z Tek Bins ...