![GSi 40-SERIES Скачать руководство пользователя страница 121](http://html1.mh-extra.com/html/gsi/40-series/40-series_construction-manual_2275090121.webp)
Figure 8-24
Exploded views of the upper and lower portions of the roof panel
A
Roof panel (CTR-0393)
D
5/16 x 1 in. flange bolt with sealing washer (S-
10260)
B
Exposed gap
E
5/16 in. flange nut (S-3611)
C
Roof rafter assembly
4. When the initial roof panels (A) are installed, fill in the exposed gaps (B). Working in a
counter-
clockwise direction
, install three additional roof panels (as shown), overlapping each roof panel on
the left. Adjust the roof panels as needed.
NOTE:
You will need to tuck one roof panel per gap under the previously installed roof panel, by
slightly lifting the upper rib (F) of the previously installed panel and allowing the lower rib (G)
of the new roof panel to be tucked under.
PNEG-4472
72 Ft Diameter Z-Tek Bins
121
Содержание 40-SERIES
Страница 6: ...NOTES 6 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 18: ...NOTES 18 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 26: ...NOTES 26 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 34: ...NOTES 34 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 72: ...NOTES 72 PNEG 4472 72 Ft Diameter Z Tek Bins ...
Страница 168: ...NOTES 168 PNEG 4472 72 Ft Diameter Z Tek Bins ...