7
Roof Curb Installations Only:
•
Sufficient structural support must be determined prior
to locating and mounting the curb and package unit.
• Ductwork must be constructed using industry guide-
lines. The duct work must be placed into the roof curb
before mounting the package unit.
•
Curb insulation, cant strips, flashing and general roof
-
ing material are furnished by the contractor.
Roof Curb Installation
Rigging Details
IMPORTANT NOTE:
If using bottom discharge with roof
curb, ductwork should be attached to the curb prior to install-
ing the unit. Ductwork dimensions are shown in roof curb
installation instructions.
Refer to the Roof Curb Installation Instructions for proper
curb installation. Curbing must be installed in compliance
with the National Roofing Contractors Association Manual.
Lower unit carefully onto roof mounting curb. While rigging
unit, center of gravity will cause condenser end to be lower
than supply air end.
Roof Curb Installation
GAS PIPING
IMPORTANT NOTE:
This unit is factory set to operate on
natural gas at the altitudes shown on the rating plate.
The rating plate is stamped with the model number, type of
gas and gas input rating. Make sure the unit is equipped to
operate on the type of gas available. Conversion to LP gas
is permitted with the use of a factory authorized conversion
kit. Contact your distributor or refer to the specification sheet
for your model for a listing of approved LP gas conversion
kit(s). Refer to the Installation Manual provided with the LP
kit for conversion from natural gas to propane gas.
The minimum supply pressure should not vary from that
shown in the Inlet Gas Pressure table because this could
prevent the unit from having dependable ignition. In addi-
tion, gas input to the burners must not exceed the rated in-
put shown on the rating plate. Overfiring of the unit could
result in premature heat exchanger failure.
Natural
Min. 5.0" W.C., Max. 10.0" W.C.
Propane
Min. 11.0" W.C., Max. 13.0" W.C.
INLET GAS PRESSURE
Inlet Gas Pressure Must be within the Minimum and Maximum Value
Shown in Table Above.
High Altitude Derate (U.S. Installations Only)
Installation of this furnace at altitudes above 2000 ft (610 m)
shall be made in accordance with the Listed High Altitude
Conversion Kit available with this furnace.
Содержание GPG 16 M Series
Страница 30: ...30 THIS PAGE LEFT INTENTIONALLY BLANK...
Страница 31: ...31 THIS PAGE LEFT INTENTIONALLY BLANK...