28
Start-up Checklist
*Store in job
fi
le
Pre Start-Up
(Check each item as completed)
Verify all packaging material has been removed.
Remove all shipping brackets per installa
�o
n instruc
�on
s.
Verify the job site voltage agrees with the unit serial plate.
Verify condensate conn
ec�o
n is installed per installa
�
on instruc
�ons.
Verify proper clearance around the uni
�
or safety, service, maintenance and proper unit opera
�on
.
Verify proper weatherproo
fi
ng of all ductwork, roof curbs and electrical connection s.
Check tha
�
he
fl
ue screen is in place.
Check gas piping for leaks.
Verify gas pressure to the uni
�
s within the range speci
fi
ed on the serial plate.
Check to ensure that all fans, pulleys and wheels are secure.
Check for proper bel
�en
sion and alignment per insta
lla�o
n instructions .
Check refrigerant piping for rubbing and leaks.
Repair if necessary.
Check unit wiring to ensure i
�
s no
�
n contact with refrigerant piping or sharp metal edges.
Check all electrical connec
�
ons and terminals.
Tighten as needed.
Verify tha
�
he crankcase heaters have been energized for 24 hours.
Verify the scroll compressor(s) are rota
�
ng in the right direction .
Verify all accessories are installed and opera
�
ng correctly.
Check
filt
ers and replace if necessary.
Verify the insta
lla�
on o
�h
e thermostat.
9/2014
Date: ___________________________________
Model Number: ___________________________________
Serial Number: ___________________________________
Technician: ___________________________________
Loca
�
on:
__________________________________________
__________________________________________
__________________________________________
Unit #:
__________________________________________
Air Conditioning & Heating
Содержание GPG 16 M Series
Страница 30: ...30 THIS PAGE LEFT INTENTIONALLY BLANK...
Страница 31: ...31 THIS PAGE LEFT INTENTIONALLY BLANK...