![Global VR Blazing Angels Green Label WWII Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/global-vr/blazing-angels-green-label-wwii/blazing-angels-green-label-wwii_operation-and-service-manual_2233375008.webp)
Chapter 2 — Installing a New Cabinet
Blazing Angels Operation and Service Manual
Page 8 of 64
040-0168-01 Rev. B 3/14/2008
9.
Power ON the cabinet using the ON/OFF switch on the AC Power Plate. Verify that the game
boots properly.
Note:
Instrument panel and exhaust port lighting will not come on until the Attract Mode
starts.
10.
Once the Attract movie starts, press the Operator
TEST
button to open the Operator Menu.
Select
System Tests
and make sure all controls and coin inputs are working.
11.
Play a game to verify proper operation. Calibrate joystick and throttle if needed (see page 26).
12.
Place a Connector Bracket over the seam between the two cabinets, as shown below, and secure
it using six (6) ¼-20 x 1-¼" bolts with flat and lock washers. Repeat for the other side.
13.
Place the wing as shown below, with the NO STEP Decal facing up, if already applied, and
secure it with the eight (8) ¼-20 x 1-¼" bolts with 1" fender washers.
14.
If the NO STEP Decal was not already applied, apply it to the top of each wing, aligned with the
player entry, as shown below:
15.
The game is now ready to play. Enter the Operator Menu to set up pricing and other Operator
Settings.