1.

   This gate operator is only intended for use on gates 

intended for vehicular access and is not intended for 

pedestrian gate applications. Pedestrians must use a 

separate entrance. 

2.

  The GHOST CONTROLS

®

 Automatic Gate Opener 

can be installed on a pull-to-open application with the 

items included in the kit.  For push-to-open applica-

tions you will need to purchase the required Push-To-

Open (item AXPO) bracket kit from your local retailer 

or visit 

ghostcontrols.com/shop

 or contact GHOST 

CONTROLS

®

 Sales at 850-846-6400 to purchase. 

3.

  This GHOST CONTROLS

®

 Automatic Gate Opener 

features a patent-pending SafeForce

®

 power limiting 

feature that doesn’t require Photo Eyes for entrapment 

protection in most applications of a properly installed 

gate. During installation, you may instead choose to use 

external monitored safety devices such as non-contact 

photo eyes (item AXPE sold separately) and will need 

to enable this setting on the main system controller 

during setup.

4.

  The operator can be used on a variety of gate types, 

but 

CAN NOT BE USED ON SOLID OR WOOD 

PANEL GATES. Solid panel gates have a higher 

resistance to wind and may result in damage to the 

automatic gate operator.

5.

  All GHOST CONTROLS

®

 Automatic Gate Operators 

include automatic reversing safety features that will 

make the gates stop and reverse direction within 2 sec-

onds of encountering an obstruction. There is a manual 

setting on the main gate operator control board labeled 

Force Setting that adjusts the sensitivity of this feature.

6.

  This GHOST CONTROLS

®

 Automatic Gate 

Operator can be enhanced with additional GHOST 

CONTROLS

®

 accessories such as our remote  

transmitters, keypads, and all other accessories, 

sold separately. (Accessories see page 64).  

The GHOST CONTROLS

®

 technical support  

team is happy to assist in verifying compatibility  

of any products not offered by GHOST  

CONTROLS

®

. For additional assistance, please  

contact GHOST CONTROLS

®

 Technical support 

ghostcontrols.com/pages/technical-support

 or by calling 

850-898-1411.

7.

  Check all local building codes and ordinances prior to 

installing this automatic gate operator system to make 

sure your planned installation is in compliance.

8.

  Your gate must be in good working condition before 

installation of the automatic gate operator system and 

meet the following criteria:  

 A.  

GATE CAN NOT USE WHEELS for support or    

   drag along the ground at any point in the opening    

   or closing cycle.

B.

  

GATE SHOULD BE LEVEL, PLUMB, AND 

MOVE FREELY IN BOTH DIRECTIONS 

WHEN MINIMAL FORCE IS APPLIED IN 

THE OPENING OR CLOSING DIRECTION.

C.

  Gate should NOT open uphill or downhill.

9.

  The vehicular entry gate system must be installed  

in a location that prevents entrapment by providing  

sufficient clearance between it and adjacent structures 

when opening and closing. 

SYSTEM OVERVIEW

    IMPORTANT INSTRUCTIONS                                     

Thank you for choosing a GHOST CONTROLS

®

 Automatic Gate Opener system, the most innovative gate opener systems 

available for residential applications on the market today. This manual will guide you through the proper installation and main-

tenance methods. To reduce the risk of injury or death: 

READ, UNDERSTAND, AND FOLLOW ALL INSTRUCTIONS 

CAREFULLY AND COMPLETELY.  Following these directions is critical to a successful and safe operating environment.

Содержание TDS2

Страница 1: ... You must purchase a 12V Automotive Deep Cycle Marine Battery before installing or purchase our optional Battery Box Kit ABBT2 for installing your operator Made in China 03 2021 TDS2IM Ghost Controls 2021 WARNING This product can expose you to chemicals including lead which is known to the State of California to cause cancer For more information go to www P65Warnings ca gov ...

Страница 2: ...46 6400 Monday through Friday 8 00 5 00 EST For installation assistance and technical support Call 850 898 1411 Monday through Friday 8 00 5 00 EST Product information technical article and installation videos can be found at ghostcontrols com help or ghostcontrols com pages installation video 2 T D S 2 D U A L K I T G h o s t C o n t r o l s 2 0 2 1 ...

Страница 3: ... 29 Setting the Closed Limit page 34 Powering the System AC page 35 Powering the System Solar page 36 Setting the Auto Close Feature page 36 PUSH TO OPEN INSTALLATION page 39 Control Box Installation page 44 Battery Installation page 45 Connecting Arm to Control Box page 46 Setup System Controller page 47 Front Mount Gate Bracket Installation page 50 Setting the Open Limit page 55 Powering the Sys...

Страница 4: ...att Solar Panel Kit AXDP or 30 Watt Solar Panel Kit AX30W can be used to charge the battery Up to 30 Watts of solar power can be used CUSTOMIZING YOUR GATE Information on additional accessories shown below can be found on the accessory page 64 or visit www ghostcontrols com SECOND Operator power cables TRENCH Pedestrian Gate Minium of 20 Feet Wireless Vehicle Sensor AXWV OR Low Voltage Wire AXLV B...

Страница 5: ...__________________________________________________ State _____________________ Zip ______________________ Phone Number ______________________________________ Email Address _____________________________________________________ Items Purchased TSS1 TDS2 Where did you buy your gate opener system please include a copy of your receipt Type of gate you are using Chainlink Ornamental Tube Approximate Gat...

Страница 6: ...em Current 1 2 Amps is typical when active Standby is 20 milliamps Operator Arm Maximum Stroke Distance 20 Inches Maximum Gate Length 20 feet Operator Opening Speed 90 degrees in approximately 15 seconds Maximum Operator Opening Range 110 degrees Linear Actuator Operating Temperature 5 F to 160 F Maximum Gate Length and Weight Max 900 lbs 800 lbs 700 lbs 600 lbs 500 lbs 400 lbs 350 lbs 325 lbs 300...

Страница 7: ... line to prevent public access to it Most applications are installed in a pull to open configuration so that the gate opens into the property and away from any public roads IX The control board for the gate operator system should be protected from unauthorized access inside the control box to prevent tampering or adjustments to its setting once installed The control box is designed so that a padlo...

Страница 8: ...h as a push button or a wired keypad Note that wireless transmitters and wireless keypads cannot deactivate the alarm The gate operator system is powered off and then on again at the main power switch in the control box NOTE The alarm may also be used as audio feedback for other modes of operation under normal operation SWING GATE PROTECTION AND ENTRAPMENT ZONES As specified in Gate Operator Safet...

Страница 9: ...int between opener and gate Keep hands feet and pets away from this area when gate is in motion Path of the moving gate All one zone Leading edge of gate and pinch point between gates in a dual gate installation The leading edge of the gate in motion can easily cause injury to people pets or livestock and will damage property including vehicles if it comes into contact with them ...

Страница 10: ...this feature 6 This GHOST CONTROLS Automatic Gate Operator can be enhanced with additional GHOST CONTROLS accessories such as our remote transmitters keypads and all other accessories sold separately Accessories see page 64 The GHOST CONTROLS technical support team is happy to assist in verifying compatibility of any products not offered by GHOST CONTROLS For additional assistance please contact G...

Страница 11: ... operator properly can increase the risk of injury or death 13 SEPARATE PEDESTRIAN GATE IS REQUIRED 14 Single or dual gate operation based on the size of your opening gate specifications and operator system capacities A Dual gate operations require trenching across the driveway so that the power cable for the sec ondary gate operator can be buried shown in diagram below B The power cable should al...

Страница 12: ...hould not be used to support the gate 3 Extremely heavy gates that exceed 200 lbs in weight per leaf should be mounted with ball bearing hinges that include grease fittings 4 The gate should be mounted to a very stable post or column that is secured in the ground with concrete Securing the post with concrete reduces the twisting effect that the torque of the gate places on the mounting post column...

Страница 13: ... code in your area if it will be mounted outside 10 If choosing to use an AC transformer for the battery recharging power source you should consider the distance from an outlet to your battery box A No more than 1000 feet of low voltage wire may be used between the AC transformer and the gate operator system due to electrical losses If your application exceeds 1000 feet in distance you must use So...

Страница 14: ...ntact with standing or flowing water which will damage the system This mounting location may cause undesirable twisting or flexing of the gate while in motion OPERATOR REAR MOUNT INSTALLATION CONSIDERATIONS The GHOST CONTROLS Automatic Gate Operator system is designed for installation on rectangular square or round posts for 3 or 4 round steel posts we offer the AX3R AND AX4R ROUND POST ADAPTER AC...

Страница 15: ...2 1 Wire Strippers Cutters Level Corded Cordless Drill Standard or MetricWrenches Tape Measure Standard or Metric Socket Set 5 16 Drill Bit 7 32 Drill Bit 7 16 Drill Bit longer than diameter or thickness of post Clamp Phillips Head Screwdriver TOOLS NEEDED ...

Страница 16: ...1ST OPERATOR Front Mounting Hardware Rear Mounting Hardware Control Box Gate Mounting Hardware Gate and Front Mount Hardware Post and Rear Mount Hardware OR AC Transformer in TDS2 Kit 1st Opener Arm Control Box Mounting 3 Button Remote 10W Solar Panel TDS2XP Kit ...

Страница 17: ...l s 2 0 2 1 Front Mounting Hardware Rear Mounting Hardware Gate Mounting Hardware Gate and Front Mount Hardware Post and Rear Mount Hardware 2nd Opener Arm Positive Stop Gate Bracket Qty 1 3 Button Remote INCLUDED PARTS IN KIT PARTS FOR 2ND OPERATOR ...

Страница 18: ... property FOR PUSH TO OPEN APPLICATIONS PLEASE GO TO PUSH TO OPEN APPLICATION ON PAGE 39 STEP 1 Establish and mark the horizontal center lines of the gate and the post for proper alignment of gate brackets NOTE Wheels cannot be used with any Ghost Controls gate opener system For gates weighing over 200 lbs ball bearing hinges are recommended Operator is not for use on solid panel privacy gates NOT...

Страница 19: ...bracket and exit bottom hole of post bracket as shown below Fasten a M10 washer and M10 locknut on the end of the bolt DO NOT overtighten the nuts because the pivot brackets may need to be adjusted later STEP 3 Clamp post bracket to post for alignment After the post bracket is pre assembled and the horizontal centerline has been marked on the post as referred to in STEP 2 and 3 proceed to CLAMP TH...

Страница 20: ...tching the wooden post for proper installation of the post bracket Follow the diagram for proper notching of a round post NOTE For 3 and 4 round steel posts we offer the AX3R AND AX4R round post adapter accessories sold separately See illustration using the round post adapter below 4 5 Height 4 3 8 Width 4 minimum ...

Страница 21: ... Once the clearances are correct place the secondary bolt into the pivot bracket as shown Insert the M10x1 5x75mm bolt and M10 washer through the post bracket hole then first pivot bracket pivot spacer second pivot bracket and exit out bottom hole of post bracket as shown below Fasten a M10 washer and M10 locknut on the end of the bolt Finish by tightening both bolts on post bracket Adjustposition...

Страница 22: ...es are large enough and all aligned C Insert 1 M 10 175mm bolt and 1 flat washer through the rear post bracket hole on the post and secure on backside with 1 flat washer and 1 M10 locknut as shown and loosely tighten to secure the rear bracket to the post Repeat this 3 more times for the other bolts Once all 4 bolts are in place with the bracket aligned with the bolts in the center of the slots fi...

Страница 23: ...nd to keep dirt and water from damaging the control board and within 4 feet of the operator arm in order for the operator cable to reach the control box A Pre drill 4 holes 7 32 drill bit in backside of control box and through the fencing where you will be secur ing the control box to B Now use the 4 supplied phillips screws to mount the control box to the fence C Make sure the on off switch on th...

Страница 24: ...ol board harness Strain Relief B Connect the terminal leads of the battery harness to your battery IMPORTANT YOU NEED A 12V DEEP CYCLE MARINE AUTOMOTIVE BATTERY OR THE ABBT2 BATTERY BOX KIT WITH TWO BATTERIES SYSTEM WILL NOT OPERATE WITHOUT A BATTERY INSTALLED AND CONNECTED AT ALL TIMES C Connect the battery harness from the control box to the battery Make sure RED WIRE CONNECTS TO BATTERY S TERMI...

Страница 25: ...rew terminal on control board and insert the red black green and white wires left to right into the matching color coded terminals and tighten each of the screws so that the wires do not come loose and fall out You will connect the second operator wires later into the 2nd operator screw terminal C Make sure wires are not inserted too far into the terminal slots and that the wire insulation is not ...

Страница 26: ...t few sections Because this control box may be mounted within reach of children or potential vandals we recommend a padlock to securely lock this box in the closed position to prevent tampering NOTE BEFORE PROCEEDING MAKE SURE THE ON OFF SWITCH ON BOTTOM OF CONTROL BOX IS IN THE OFF POSITION STEP 10 Check the system DIP switch settings and verify that they are in the correct positions as shown DIP...

Страница 27: ...ces Than Switch To The Right YOUR SYSTEM WILL NOT WORK IF SAFTEY MODE IS ON AND YOU DO NOT HAVE MONITORED EXTERNAL SAFETY DEVICES CONNECTED DIP Switch OFF Position FACTORY SETTING ON Position 3 Patent pending SafeForce Mode Factory Default Force output is limited to ensure safe operation as specified by Type C in UL325 requirement Monitored Safety Mode Monitored safety devices required Compatible ...

Страница 28: ...remote transmitter to fully retract the arm The arm will stop on its own The arm in the fully retracted position will determine the OPEN position of the gate NOTE The arm has an internal limit swtich that is fixed and is not adjustable ARM FULLY RETRACTED WARNING DO NOT SCREW THE OPERATOR ARM IN OR OUT TO ADJUST YOUR GATE POSITION DOING SO CAUSES THE SYSTEM TO NOT FUNCTION PROPERLY ARM EXTENDED OU...

Страница 29: ...plied gate and front mount hardware Insert 2 M8 65mm Hex Screws and 2 M8 Flat Washers through the Gate Mount Bracket holes and attach to the Tubular Clamp Brackets and finish by inserting 2 M8 Flat Washers and 2 M8 Hex Nuts to back of Clamp Brackets GO TO STEP 14A STEP 13B FOR FLAT PANEL GATES attach front mount bracket to the operator The gate must remain in the desired open position OPEN THE GAT...

Страница 30: ...and clevis hairpin through the front of the operator and gate bracket to secure the bracket onto the front mount of the gate operator WARNING DO NOT SCREW THE OPERATOR ARM IN OR OUT TO ADJUST YOUR GATE POSITION DOING SO CAUSES THE SYSTEM TO NOT FUNCTION PROPERLY B Now install the pre assembled tubular clamp bracket over the center most bar on your tube gate with the gate at the open position C Ins...

Страница 31: ... POSITION A Line up the pre assembled front mount gate bracket over the center most bar on your gate and mark the center location of the outermost hole on the gate WARNING DO NOT SCREW THE OPERATOR ARM IN OR OUT TO ADJUST YOUR GATE POSITION DOING SO CAUSES THE SYSTEM TO NOT FUNCTION PROPERLY Center punch locationfordrilling outermosthole Markcenter locationof outermosthole CL CL Outermosthole hasb...

Страница 32: ...t operator from front mount gate bracket and swing away from the gate D Assemble clevis pin front spacer and hair pin to operator to prevent loss E Now you can mark and drill the innermost hole on the front mount bracket shown below Markanddrillthecenterlocationof theinnermostholefortheGateBracket CL F Align the innermost hole of the gate bracket and insert 1 M8 x 65mm flat washer and 1 M8 nylon l...

Страница 33: ... to image on page 4 for second operator You will need to dig a trench and use pvc conduit to put second opera tor power cables thru to connect to the control box on the opposite side of the driveway STEP 16 Install the Positive Stop Plate Do not install if installing the Zombielock Use the supplied Positive Stop Plate and U bolts to install the Positive Stop Plate on the INSIDE OF THE FIRST OPERAT...

Страница 34: ...esired closed position The gate can move only if pressure is maintained Releasing the JOG button will stop the gate immediately Once the 1st set is programmed then repeat for the 2nd gate with the 2nd set JOG CLOSE button B Both JOG OPEN or JOG CLOSE buttons are needed to fine tune your desired CLOSED position STEP 19 Press and hold the 1st set limit button on the control panel until it beeps then...

Страница 35: ...trol board Once inserted then tighten each screw so that the wires do not come loose and fall out The transformer is not polarity sensitive so either wire can go to either transformer terminal The left terminal will not be used Do not plug in the transformer during this step B Connect AC Transformer to outdoor outlet Make sure you connect AC Transformer wires to control board prior to plugging in ...

Страница 36: ...m below DO NOT CONNECT AC TRANSFORMER IF USING SOLAR POWER DO NOT USE this terminal if using Solar Panel Black Red Battery Harness Operator Arm B Check that green LED Power status on top center of control board is on This indicates that the battery is being charged C Check the chart shown for number of hours of direct sunlight available for solar applications D Determine the number of expected win...

Страница 37: ...period begins once the gate has reached its open limit Minimum AUTOCLOSE Time Period Maximum AUTOCLOSE Time Period 6 Seconds 60 Minutes If longer time is needed you should enable PartyMode or Disable AUTOCLOSE A Press and hold the SET AUTOCLOSE TIME button until it beeps B Release the button and start counting the blinks or watching a clock until the desired AUTOCLOSE time has been reached the LED...

Страница 38: ...the SET AUTOCLOSE TIME button The LED next to the AUTOCLOSE button will start blink ing at the rate of 1 blink per second C Within 5 seconds press and release the SET AUTOCLOSE TIME button to disable the AUTOCLOSE feature D The AUTOCLOSE feature is now disabled until you enable it with a new setting IF THE AUTOCLOSE LED IS STILL ON THE AUTOCLOSE HAS NOT BEEN DISABLED AUTOCLOSE LED INDICATOR The AU...

Страница 39: ...e Push To Open Bracket Kit AXPO before you start installing FOR PULL TO OPEN APPLICATIONS PLEASE SEE PULL TO OPEN APPLICATION ON PAGE 18 STEP 1 Establish and mark the horizontal center lines of the gate and the post for proper alignment of gate brackets NOTE This center point will be used for mounting the post bracket in STEP 4 PUSHTOOPENINSTALLATION OPERATOR ARM INSTALLATION NOTE Wheels cannot be...

Страница 40: ...le of post bracket as shown Fasten a M10 washer and M10 locknut on the end of the bolt DO NOT overtighten the nuts because the Push To Open brackets may need to be adjusted later PUSH TO OPEN BRACKET PUSH TO OPEN BRACKET NYLON PIVOT SPACER COMPLETED ASSEMBLY EXPLODED M10 X 1 5 X 75MM BOLT M10 WASHER M10 WASHER M10 LOCKNUT POST BRACKET STEP 3 Clamp post bracket to post for alignment After the post ...

Страница 41: ...ing the wooden post for proper installation of the post bracket Follow the diagram below for proper notching of a round post 4 5 Height 4 3 8 Width 4 minimum NOTE For 3 and 4 round steel posts we offer the AX3R AND AX4R round post adapter accessories sold separately See illustration using the round post adapter below ...

Страница 42: ...ondary bolt into the post bracket as shown Insert the M10x1 5x 75mm bolt and M10 washer through the post bracket hole then first push to open bracket pivot spacer second push to open bracket and exit out bottom hole of post bracket as shown below Fasten a M10 washer and M10 locknut on the end of the bolt Finish by tightening both bolts on post bracket 4 0 Adjustposition asnecessary Bracketflushwit...

Страница 43: ...les are large enough and all aligned C Insert 1 M 10 175mm bolt and 1 flat washer through the rear post bracket hole on the post and secure on backside with 1 flat washer and 1 M10 locknut as shown and loosely tighten to secure the rear bracket to the post Repeat this 3 more times for the other bolts Once all 4 bolts are in place with the bracket aligned with the bolts in the center of the slots f...

Страница 44: ... control board and within 4 feet of the operator arm in order for the operator cable to reach the control box A Pre drill 4 holes 7 32 drill bit in backside of control box and through the fencing where you will be secur ing the control box to Make sure arm cable is within 4 feet of the operator arm and reaches the control box B Now use the 4 supplied phillips screws to mount the control box to the...

Страница 45: ...ess Strain Relief B Connect the terminal leads of the battery harness to your battery IMPORTANT YOU NEED A 12V DEEP CYCLE MARINE AUTOMOTIVE BATTERY OR THE ABBT2 BATTERY BOX KIT WITH TWO BATTERIES SYSTEM WILL NOT OPERATE WITHOUT A BATTERY INSTALLED AND CONNECTED AT ALL TIMES C Connect the battery harness from the control box to the battery Make sure RED WIRE CONNECTS TO BATTERY S TERMINAL CONNECT F...

Страница 46: ...rew terminal on control board and insert the red black green and white wires left to right into the matching color coded terminals and tighten each of the screws so that the wires do not come loose and fall out You will connect the second operator wires later into the 2nd operator screw terminal C Make sure wires are not inserted too far into the terminal slots and that the wire insulation is not ...

Страница 47: ...t few sections Because this control box may be mounted within reach of children or potential vandals we recommend a padlock to securely lock this box in the closed position to prevent tampering NOTE BEFORE PROCEEDING MAKE SURE THE ON OFF SWITCH ON BOTTOM OF CONTROL BOX IS IN THE OFF POSITION STEP 10 Check the system DIP switch settings and verify that they are in the correct positions as shown DIP...

Страница 48: ...evices Than Switch To The Right YOUR SYSTEM WILL NOT WORK IF SAFTEY MODE IS ON AND YOU DO NOT HAVE MONITORED EXTERNAL SAFETY DEVICES CONNECTED DIP Switch OFF Position FACTORYSETTING ON Position 3 Patent pending SafeForce Mode Factory Default Force output is limited to ensure safe opera tion as specified by Type C in UL325 requirement Monitored Safety Mode Monitored safety devices required Compatib...

Страница 49: ... switch that is fixed and is not adjustable The arm when in the fully retracted position will determine the closed position of the gate Use the remote transmitter to fully retract the arm The arm will stop on its own NOTE The arm has an internal limit swtich that is fixed and is not adjustable WARNING DO NOT SCREW THE OPERATOR ARM IN OR OUT TO ADJUST YOUR GATE POSITION DOING SO CAUSES THE SYSTEM T...

Страница 50: ...ed gate and front mount hardware Insert 2 M8 65mm Hex Screws and 2 M8 Flat Washers through the Gate Mount Bracket holes and attach to the Tubular Clamp Brackets and finish by inserting 2 M8 Flat Washers and 2 M8 Hex Nuts to back of Clamp Brackets GO TO STEP 14A STEP 13B FOR FLAT PANEL GATES attach front mount bracket to the operator The gate must remain in the desired closed position CLOSE THE GAT...

Страница 51: ... and clevis hairpin through the front of the operator and gate bracket to secure the bracket onto the front mount of the gate operator WARNING DO NOT SCREW THE OPERATOR ARM IN OR OUT TO ADJUST YOUR GATE POSITION DOING SO CAUSES THE SYSTEM TO NOT FUNCTION PROPERLY B Now install the pre assembled tubular clamp bracket over the center most bar on your tube gate with the gate at the closed position C ...

Страница 52: ...SED POSITION A Line up the pre assembled front mount gate bracket over the center most bar on your gate and mark the center location of the outermost hole on the gate NOTE DO NOT SCREW THE OPERATOR ARM IN OR OUT TO ADJUST YOUR GATE POSITION DOING SO CAUSES THE SYSTEM TO NOT FUNCTION PROPERLY Center punch location for drilling outermost hole Mark center location of outermost hole CL Outermost hole ...

Страница 53: ...front mount gate bracket and swing away from the gate Remove the clevis pin hair pin and front spacer D Assemble clevis pin front spacer and hair pin to operator to prevent loss E Now you can mark and drill the innermost hole on the front mount bracket shown below Markanddrillthecenterlocationof theinnermostholefortheGateBracket CL F Align the innermost hole of the gate bracket and insert 1 M8 x 6...

Страница 54: ...P STEPS 7 8 NOTE Refer to image on page 4 for second operator You will need to dig a trench and use pvc conduit to put second opera tor power cables thru to connect to the control box on the opposite side of the driveway STEP 16 Install the Positive Stop Plate Use the supplied Positive Stop Plate and U bolts to install the Positive Stop Plate on the OUTSIDE OF THE FIRST OPERATOR GATE as shown in t...

Страница 55: ...ove only if pressure is maintained Releasing the JOG button will stop the gate immediately Once the 1st set is programmed then repeat for the 2nd gate with the 2nd set JOG CLOSE button B Both JOG OPEN or JOG CLOSE buttons are needed to fine tune your desired OPEN position STEP 19 Press and hold the 1st set limit button on the control panel until it beeps then release Then Press and hold the 2nd se...

Страница 56: ...trol board Once inserted then tighten each screw so that the wires do not come loose and fall out The transformer is not polarity sensitive so either wire can go to either transformer terminal The left terminal will not be used Do not plug in the transformer during this step B Connect AC Transformer to outdoor outlet Make sure you connect AC Transformer wires to control board prior to plugging in ...

Страница 57: ...m below DO NOT CONNECT AC TRANSFORMER IF USING SOLAR POWER DO NOT USE this terminal if using Solar Panel Black Red Battery Harness Operator Arm B Check that green LED Power status on top center of control board is on This indicates that the battery is being charged C Check the chart shown for number of hours of direct sunlight available for solar applications D Determine the number of expected win...

Страница 58: ...period begins once the gate has reached its open limit Minimum AUTOCLOSE Time Period Maximum AUTOCLOSE Time Period 6 Seconds 60 Minutes If longer time is needed you should enable PartyMode or Disable AUTOCLOSE A Press and hold the SET AUTOCLOSE TIME button until it beeps B Release the button and start counting the blinks or watching a clock until the desired AUTOCLOSE time has been reached the LED...

Страница 59: ...the SET AUTOCLOSE TIME button The LED next to the AUTOCLOSE button will start blink ing at the rate of 1 blink per second C Within 5 seconds press and release the SET AUTOCLOSE TIME button to disable the AUTOCLOSE feature D The AUTOCLOSE feature is now disabled until you enable it with a new setting IF THE AUTOCLOSE LED IS STILL ON THE AUTOCLOSE HAS NOT BEEN DISABLED AUTOCLOSE LED INDICATOR The AU...

Страница 60: ...nd SET JOG CLOSE or JOG OPEN buttons The JOG buttons can be used as fine adjustment of the CLOSED limit 2 Press and hold the 1st SET 2nd SET button until the alarm sounds then release the button 3 Press the remote to run the gate to the fully OPEN position Repeat Steps 1 3 only if you have a second arm 4 The unit will beep once to indicate that the new CLOSED limit is learned and stored Verify the...

Страница 61: ... present and respond accordingly Lock if present will be pulled unlocked for the first few seconds while opening If lock is not completely pulled the gate will not open to prevent damaging to the gate and lock Lock will also be pulled unlocked near the closed limit position as it is closing to ensure a smooth and soft operation DISCONNECTING LOCK FROM CONTROL BOARD Turn control panel OFF Hold down...

Страница 62: ...en gate to the full open position OPENING REVERSE INPUT OPN RVRS Use this terminal with photo eye beams or safety edge Active Prevents gate from opening and if gate is opening it will reverse gate to the closed position MONITORED SAFETY DEVICES PHOTO EYES AXPE NOTE Please refer to manufacturer s manual or website for more detailed instructions on how to connect and use accessories with your gate o...

Страница 63: ... the key because removing power does not unlock this lock 1 Move the gate operator control box switch to the off position The gate operator is battery powered so unplugging the AC transformer does not turn the power to the operator off 2 Remove the hairpin clip and clevis pin from the FRONT mount of the gate operator 3 Swing the operator out of the way of the gate 4 Swing the gate to the fully ope...

Страница 64: ...ded convenience for access to a keypad from any vehicle PREMIUM 10 WATT MONOCRYSTALLINE SOLAR PANEL AXDP The monocrystalline 10W solar panels are a great solution for anyone who is installing a gate operator system in a remote location that does not have easy access to 120V AC power or for those who do not want to be on the grid Hardware and mounting post included PREMIUM 30 WATT MONOCRYSTALLINE S...

Страница 65: ...ath the ground surface next to your driveway and takes 2 C batteries Does not connect into the control box PUSH BUTTON AXPB The standard push button will control a single or dual gate system up to 1 000 ft away with low voltage wire LOCKING CLEVIS PIN AXLC The GHOST CONTROLS Locking Clevis Pin allows you to easily secure the gate operator arm to the mounting brackets with a padlock by replacing th...

Страница 66: ......

Страница 67: ......

Страница 68: ......

Отзывы: