8 WELDING
Operating instructions CNC 4.0 400/500/630
46
Danger of damaging the machine!
Take the welded component out of the clamps !
All joints must have cooled completely before the pressure test is
performed. This is generally the case approx. 1hour after the last fusion
operation.
8.4
Visual check of welding bead
Immediately after removing the welded pipes/fittings check visually the
part for correctly formed double bead and the k-value.
Wait for pressure tests at least 1 hour!
Warning
Attention
Even double
bead
k > 0
Содержание CNC 4.0 400
Страница 1: ...Instruction manual GF Piping Systems CNC 4 0 400 500 630 Butt Fusion Machine...
Страница 5: ...Operating instructions CNC 4 0 400 500 630 Table of contents III...
Страница 6: ...Table of contents Operating instructions CNC 4 0 400 500 630 IV...
Страница 18: ...5 Technical specifications Operating instructions CNC 4 0 400 500 630 12 only with PP version...
Страница 19: ...Operating instructions CNC 4 0 400 500 630 5 Technical specifications 13...
Страница 93: ...Operating instructions CNC 4 0 400 500 630 14 Customer Service 87...
Страница 95: ......
Страница 97: ...Betriebsanleitung GF Piping Systems CNC 4 0 400 500 630 Stumpfschweissmaschine...
Страница 101: ...Betriebsanleitung CNC 4 0 400 500 630 Inhaltsverzeichnis III 14 Service Kundendienst 93...
Страница 102: ...Inhaltsverzeichnis Betriebsanleitung CNC 4 0 400 500 630 IV...
Страница 103: ......
Страница 116: ...Betriebsanleitung CNC 4 0 400 500 630 5 Technische Daten 14 nur mit PP Version...
Страница 117: ...5 Technische Daten Betriebsanleitung CNC 4 0 400 500 630 15...
Страница 196: ......
Страница 197: ......
Страница 199: ......