34
NRG 26-60 - Installation & Operating Manual -
819875-00
Bringing into service
Before bringing into service, check that all equipment is correctly connected:
■
■
Is the polarity of the CAN bus control line correct throughout?
■
■
Is a 120 Ω terminating resistor connected to the terminal devices of the CAN bus line?
Next, switch on the supply voltage.
Changing the factory settings if necessary
You will need the following tools
■
■
Slotted screwdriver, size 2.5
Note on commissioning
During commissioning, the scaling of the measurement 0 – 100 % is set ex-works at a maxi-
mum for the corresponding electrode length.
After installation, set the measurement range to effective, system-specific values.