![Geotech ORS SITEPRO 2000 Скачать руководство пользователя страница 54](http://html1.mh-extra.com/html/geotech/ors-sitepro-2000/ors-sitepro-2000_installation-and-operation-manual_2215571054.webp)
53
Configure Panel
1. Set RECEIVE switches for the interlock channels to which the High and Low Pressure Jumpers were attached.
2. Set the RECEIVE switch for the interlock channel to which the High Sump Level switch was attached.
3. Configure the CONTROLLER ADDRESS and LOGIC switches as explained in Chapter 3.
Содержание ORS SITEPRO 2000
Страница 1: ...ORS SITEPRO 2000 Blower Pump Control Panel Installation and Operation Manual Rev 6 11 12 03 Part 10367...
Страница 11: ...10 Figure 7...
Страница 27: ...26 Figure 18...
Страница 29: ...28 Figure 19...
Страница 34: ...33 Figure 21...