52
Appendix C: Application Notes
The ORS SITEPRO™ 2000 Blower/Pump Control Panel is highly flexible and can be adapted for many different site
remediation functions. The examples in this appendix explain how to wire and configure your ORS SITEPRO™ panel for
the most commonly encountered field applications.
Application #1
ORS SITEPRO™ Blower/Pump Control Panel controlling air stripper blower and transfer pump. High Sump Level or
high/low Pressure condition must shut down feed pump controlled by separate ORS SITEPRO™ WTDP panel.
In order to shut down the WTDP panel in the event of a High Sump Level or High/Low Pressure alarm received by the
Blower/Pump panel, the High Sump Level, High Pressure and Low Pressure inputs must each be jumpered to an alarm
channel in the Blower/Pump panel. Both panels must then be configured to communicate through the Interlock
Communication Bus. Proceed as follows:
Wiring
1. Wire the sump level probe and pressure switches to the ORS SITEPRO™ Blower/Pump control panel as shown
in figure 10.
2. Install a wire jumper between terminal 5 on TB2 (High Sump Level) and one of the interlock terminals (1-4) also
on TB2.
3. Install a wire jumper between terminal 6 on TB2 (High Pressure) and one of the other interlock terminals on TB2.
4. Install a wire jumper between terminal 7 on TB2 (Low Pressure) and one of the interlock terminals on TB2.
Refer to figure 10 or to the Field Wiring Diagrams for locations of jumpers.
Configure Blower/Pump panel
1. Set the RECEIVE switches for the interlock channels to which jumpers were attached above. For example, if the
High Sump Level input was jumpered to terminal 4 (interlock 4) on TB2, set RECEIVE dip switch 8 to ON.
2. Set the SEND switches for the Interlock communication Bus channels on which the High Sump Level and High
Pressure alarms will be sent to the WTDP panel. Any of the four ICB channels can be used for this purpose.
3. Configure the CONTROLLER ADDRESS Switch and LOGIC switch as explained in Chapter 3.
Configure WTDP Panel
1. Set the RECEIVE switches to correspond to the SEND switch settings chosen for Panel #1. For example, if the
Blower/Pump panel SEND switches 1, 2 and 3 were set ON, set the WTDP panel RECEIVE switches 5, 6 and 7
to ON.
2. Configure the CONTROLLER ADDRESS switch and LOGIC switch as explained in Chapter 3.
Application #2
ORS SITEPRO™ Blower/Pump Control Panel controlling air stripper blower and feed pump. The feed pump must be shut
down in the event of a High Sump level or High/Low Pressure Condition at the air stripper.
Wiring
1. Wire the downwell WTDP probe and pressure switches into the ORS SITEPRO™ Blower/Pump Control Panel as
shown in figure 9.
2. Jumper the High and Low Pressure inputs to interlocks as explained in Application #1 above.
3. Run the High Sump Level leads (green and orange) from the air stripper sump level probe to the ORS
SITEPRO™ Blower/Pump Control Panel and wire the High Sump Level switch as an interlock. Refer to Chapter
3 for a discussion of interlock wiring.
Содержание ORS SITEPRO 2000
Страница 1: ...ORS SITEPRO 2000 Blower Pump Control Panel Installation and Operation Manual Rev 6 11 12 03 Part 10367...
Страница 11: ...10 Figure 7...
Страница 27: ...26 Figure 18...
Страница 29: ...28 Figure 19...
Страница 34: ...33 Figure 21...