Chapter 2: System Installation
1. Is the electrical service at the site properly sized for this panel and does it conform to
NEC
and local codes?
2. Are the electrical characteristics of your pump and blower compatible with those of the panel?
INSPECTION
Inspect all equipment upon arrival. Check the contents of the packing crate against the System Specification sheet at the
front of this manual. If any items are missing or damaged, make note of this on the shipping papers and immediately notify
Geotech Environmental Equipment, Inc. at 800-833-7958 OR (303) 320-4764.
PANEL INSTALLATION
Mount Panel
1. Remove the panel from its packing crate and hold it against the intended mounting surface.
2. Refer to figure 2 and position the panel so that the access door will open at least 12-1/2” without obstruction.
3. If the mounting surface is wood, use wood screws to attach the panel mounting feet to the wall. If the surface is
metal, use the panel as a template and mark the locations of the mounting holes. Then drill and tap the holes and
use self-tapping screws to mount the panel.
WIRING
Install Chassis Ground
Before beginning panel hookup procedures, run a wire from the panel chassis ground lug to a good earth ground such as
the circuit breaker panel enclosure. The ground lug is located on the chassis behind the panel faceplate (See the ORS
SITEPRO™ 2000 wiring diagram in figure 8).
The ORS SITEPRO™ 2000 Blower/Pump Controller Panel must be deployed in a
non-hazardous location and all conduit runs from the well head to the panel must
conform to Article 501-5 of the National Electrical Code (NEC) 1993.
Before deploying the ORS SITEPRO™ 2000 refer to the System Checklist at
the front of this manual and answer the following questions.
Do not use nails to attach the panel, as a misdirected hammer blow could
damage the enclosure.
All wiring must be carried out by a qualified electrician and be in accordance
with state and local codes. Proper grounding of the panel is necessary to
maintain the intrinsically safe rating of the ORS SITEPRO™ 2000. See the
following sections for panel grounding procedures.
Before installing wires, setting configuration dip switches or touching exposed
portions of the panel circuit board, safely discharge any static electricity from
your body by touching or otherwise grounding yourself to the panel chassis.
Содержание ORS SITEPRO 2000
Страница 1: ...ORS SITEPRO 2000 Blower Pump Control Panel Installation and Operation Manual Rev 6 11 12 03 Part 10367...
Страница 11: ...10 Figure 7...
Страница 27: ...26 Figure 18...
Страница 29: ...28 Figure 19...
Страница 34: ...33 Figure 21...