If your ORS SITEPRO™ 2000 is equipped with the telemonitoring option, plug your phone jack into the receptacle of the
panel modem. Refer to figure 9 for location of modem connections.
Wire Current Sensors
To provide current sensing for 3-phase blowers or pumps, install the current sensors included with the control panel. Each
sensor must be installed around one leg of the blower or pump motor power wiring as shown in figure 15. Then run the
sensor leads into the ORS SITEPRO™ control panel and wire to the terminal block provided. Secure the current sensor
with a nylon tie wrap.
In lightning prone areas, have your electrician install a phone line lightning arrestor.
Contact your telephone company for further information.
A sensor for single phase pumps is already mounted inside the control panel (if
the motor is less than 2-1/2 HP @ 230VAC or 1 HP @ 115VAC). When wiring the
pump to the panel, run one leg of the pump power wiring through the current
sensor as shown in the Field Wiring Diagram.
Содержание ORS SITEPRO 2000
Страница 1: ...ORS SITEPRO 2000 Blower Pump Control Panel Installation and Operation Manual Rev 6 11 12 03 Part 10367...
Страница 11: ...10 Figure 7...
Страница 27: ...26 Figure 18...
Страница 29: ...28 Figure 19...
Страница 34: ...33 Figure 21...