13
The ORS SITEPRO™ panel enclosure is equipped with access ports to facilitate wiring. See figure 2 (in Chapter 1) for
locations of access ports. The port on the side of the enclosure is for all
intrinsically safe
wiring. All other wiring,
including incoming power and pump connections must be routed through the access port in the bottom of the enclosure.
Wire Incoming Power
Run power wires through the port at the bottom of the enclosure and attach to the terminal block on the chassis behind
the faceplate (figure 8). Attach the power leads to terminals L1 and L2. In 115VAC systems, wire power leads to the
“HOT” and “NEUTRAL” terminals as shown in figure 8. Attach the ground wire to the grounding lug next to the terminal
block. Check tightness of terminal screws.
Wire Pump
Run the pump power wires through the port at the bottom of the enclosure and attach to the PUMP POWER OUT
terminals (figure 8). Attach the ground wire to the chassis grounding lug next to the terminal block. Check tightness of
terminal screws. For wiring instructions specific to your pump and blower, refer to the blueprint Field Wiring Diagram
provided with these items.
Wire Blower
Run the blower power wires through the port at the bottom of the enclosure and attach to the BLOWER POWER OUT
terminals (figure 8). Attach the ground wire to the chassis grounding lug next to the terminal block. Check tightness of
terminal screws. For wiring instructions specific to your pump and blower, refer to the blueprint sized Field Wiring Diagram
provided with these items.
Wire WTDP Probe
The ORS SITEPRO™ 2000 Blower/Pump Control Panel is designed for use with either a standard density actuated
WTDP probe or an ORS LO-PRO™ Air Stripper sump level probe. When the ORS SITEPRO™ is being used to control a
blower and an influent feed pump, the WTDP probe is wired to the panel as shown in figure 9. This probe uses three
separate switches (HI, LO, & LO-OVERRIDE) to monitor water level in the well. The HI and LO switches control the
normal ON/OFF cycling of the pump while the LO-OVERRIDE switch shuts off the pump in the event of a control system
failure.
Run the probe cable through the access port on the side of the enclosure and attach its leads to IS terminal strips TB1 &
TB2 as shown in figure 9.
To maintain the NEMA 4 weatherproof characteristics of your panel after wiring
has been completed, seal all wiring access ports with weatherproofs conduit
hubs.
The ORS SITEPRO™ 2000 circuit board shield (behind faceplate) is equipped
with a label that shows the locations of all terminals and configuration dip
switches. Refer to this label (and figure 8) throughout the panel wiring procedures
described in this chapter.
Do not run power wires within two inches of
intrinsically safe
(IS) wires or
terminals. Refer to figure 8 for location of IS terminals (at top of panel), and
reference
NEC
Article 508 for relevant codes.
Refer to your pump manual and heed all relevant Warnings and Cautions.
Refer to your air stripper or SVE manual and heed all relevant Warnings and
Cautions
Содержание ORS SITEPRO 2000
Страница 1: ...ORS SITEPRO 2000 Blower Pump Control Panel Installation and Operation Manual Rev 6 11 12 03 Part 10367...
Страница 11: ...10 Figure 7...
Страница 27: ...26 Figure 18...
Страница 29: ...28 Figure 19...
Страница 34: ...33 Figure 21...