![Geotech ORS SITEPRO 2000 Скачать руководство пользователя страница 18](http://html1.mh-extra.com/html/geotech/ors-sitepro-2000/ors-sitepro-2000_installation-and-operation-manual_2215571018.webp)
17
Always wire number to number (color to color) when establishing network connections between panels. The maximum
network wire run cannot exceed 3000’ (1000M).
After the
network
wiring connections have been made, the start and termination of the network must be designated by
installing jumpers on the first and last panel in the
network
. Each ORS SITEPRO™ 2000 panel is equipped with a 2-pin
jumper located next to TB4 (see figure 12). On the first and last panel in the
network
, lift the jumper cap from the pins
and reinstall it so that both pins fit into the cap.
Wire Dry Contact Outputs
The ORS SITEPRO™ 2000 features
Normally Open
and
Normally Closed
100 mA
dry contact
outputs that can be
used to trigger a wide variety of external devices including relays, visual indicators, buzzers, and security system alarms.
Two sets of
Form C dry contact
outputs are provided on TB6. The example in figure 13 shows a security system alarm
panel wired in a
Normally Closed
configuration to TB6 of the ORS SITEPRO™ 2000. The
Form C
outputs are shown
schematically (dashed box).
Figure 13
Wire Analog Inputs
Analog
input devices (pressure transducers, thermocouples, etc.) can be interfaced with the telemonitor equipped ORS
SITEPRO™ 2000 if they are wired into the
analog
input connections on TB3 (see figure 9). Figure 14 shows how a
pressure transducer might be wired to the ORS SITEPRO™. Note that the transducers power supply must be provided by
the customer or purchased from Geotech.
Wire Totalizer
Terminals 8&9 on TB4 are available for wiring a totalizer to an ORS SITEPRO™ panel that is equipped with the
telemonitoring option. Totalizers must supply a 0 to 5-24VDC pulse to the control panel. The pulse should be generated
by a solid state device (i.e. an open collector output). The pulse should be 1 msec wide minimum. The maximum rate of
pulses accepted by the panel is 120 pulses/gallon at 20 gpm this corresponds to 40Hz.
Содержание ORS SITEPRO 2000
Страница 1: ...ORS SITEPRO 2000 Blower Pump Control Panel Installation and Operation Manual Rev 6 11 12 03 Part 10367...
Страница 11: ...10 Figure 7...
Страница 27: ...26 Figure 18...
Страница 29: ...28 Figure 19...
Страница 34: ...33 Figure 21...