RS5-34 Telescopic Handler
INNER BOOM
PRINTED IN U.S.A.
703-8
913241
Template Name: OML_2_col
Rac 0-00000
Template Date: 1997_02_12
Alt= to hide template information
Alt+ to display template information
STEP 29
G1005072
G1005073
Reinstall the two side slide pads and shims on the
front of intermediate boom (both sides), using the
lock washers and bolts. Use Loctite
™
271 (red)
Thread Lock (or equivalent) on the threads of the
bolts and torque to 30 ft.-lbs. (41 Nm).
STEP 30
Remove the lifting strap and hoist from the inner
boom.
STEP 31
Push the intermediate and inner boom fully into the
main boom, this will allow enough room to reinstall
the single chain.
STEP 32
G1005079
Install the front chain sheave (1) and sheave pin (2).
NOTE:
Ensure that the retainer bolt hole in the
sheave pin is aligned with the retainer bolt hole in the
frame.
STEP 33
G1005082
Install sheave pin retaining bolt (1) and lock nut (2).
STEP 34
G1005045
Reinstall the hose tray using the nuts and bolts.
1
1
2
3
View thousands of Crane Specifications on FreeCraneSpecs.com
View thousands of Crane Specifications on FreeCraneSpecs.com