GE H
EALTHCARE
DRAFT
V
OLUSON
E8 / V
OLUSON
E6
D
IRECTION
KTD102576, R
EVISION
7
DRAFT (A
UGUST
23, 2012)
S
ERVICE
M
ANUAL
Chapter 4 - Functional Checks
4-3
5.) Hold down the
ON/OFF
Standby
button (see:
) on the control panel for ~3 seconds.
NOTE:
The mains outlet of the system for peripheral auxiliary equipment are commonly switched with the
ON/OFF
Standby button. The power switch of any attached printer(s) needs to be in ON position before
starting the system. However, be aware some auxiliary equipment may switch itself to standby mode
(e.g., Color video printer) and must therefore be switched on separately.
As soon as the software has been loaded, the system enters 2D-Mode with the probe and application
that were used before the system was shut down. Total time used for start-up is about 2 minutes.
NOTE:
The mains outlet of the system for peripheral auxiliary equipment are commonly switched with the
ON/OFF
Standby button. So the auxiliary equipment need not to be switched ON/OFF separately.
Figure 4-2 ON/OFF
Standby
button on Control Panel
ON/OFF
Standby
button