Section 3-5 - Completing the Setup
P R E L I M I N A R Y
Section 3-5
Completing the Setup
3-5-1
Purpose of this Section
This section describes how to complete the setup of the Venue™.
3-5-2
System Specifications
3-5-2-1
System Requirements Verification
•
Verify that the site meets the requirements listed in Chapter 2.
(See:
•
Verify that the specifications below do not conflict with any on-site conditions.
3-5-2-2
Physical Dimensions
3-5-2-3
Mass with Monitor and Peripherals
3-5-2-4
Acoustic Noise Level
Less than 55 dB(A) at 20 degrees Celsius, measured in the operators head position, 20 cm in front of
the keyboard’s right corner, at 1.30 m above the floor, and in a distance of 1 meter at all four sides, 1
meter above the floor.
3-5-3
Electrical Specifications
3-5-3-1
Verification of the Venue™ Voltage Setting
Verify that the mains voltage specified for the Venue™ is available on-site.
The voltage setting for the Venue™ is found on a label near the Mains Power Circuit Breaker on the
rear of the Venue™ .
3-5-3-2
Electrical Specifications for the Venue™
In the table below, the electrical specifications for Venue™ includes monitor and on board peripherals.
Table 3-12 Physical Dimensions of Venue™ with Monitor and Peripherals
in Transportation Position
Height
Width
Depth
Unit
131
48
72.5
cm
51.57
18.89
28.54
Inches
Table 3-13 Mass of Venue™ with Cockpit (monitor), without Probes and Peripherals
Model
Mass [KG]
Mass [LBS]
Venue™
63
139
WARNING
WARNING
Connecting a Venue™ to the wrong voltage level will most
likely destroy it.