GE Analytical Instruments ©2006
DLM 14291 Rev. A
4-16
I N S T A L L
P U M P O I L
H O P C A L I T E
C E L L
C O O L E R
P U M P O I L
I N S T A L L E D
0 6 J U N 0 0
d a y s h o u r s
I N I T I A L
3 7 1 2
R E MA I N I N G
3 7 1 0
E N T
i n s t a l L C L R e s c
P U M P O I L
D O
N O T
I N S T A L L
I N S T A L L
P U M P O I L
I N S T A L L E D
0 4 J U L 0 0
d a y s h o u r s
I N I T I A L
3 7 1 2
R E MA I N I N G
3 7 1 2
I N S T A L L A T I O N A C C E P T E D
To change the Supply Pressure Units
•
From the Pressure Units Setup Menu, select
Supply Press.
•
From the O
3
Supply Press Units Menu, use
the Arrow buttons to scroll to the desired
units and press ENTER.
•
From the Confirmation Screen, press ENTER
to save the new units.
•
Press CLEAR five times to return to the Main
Menu.
Setting the Consumables Installation Data
To set the installation dates:
•
From the Main Menu, select Maintenance.
•
From the Maintenance Menu, select Consumables.
•
From the Consumables Menu select Install.
•
From the Install Menu, select Pump Oil.
•
From the Pump Oil Menu, press ENTER, scroll to Install and press ENTER. The
Pump Oil Menu will indicate that the installation was accepted and then return
to the Install Menu.
•
Repeat the installation process for the Hopcalite, Cell and Cooler by selecting
each item from the Install menu, pressing ENTER, then selecting Install.
Start-up
Содержание MOA 280i
Страница 6: ...GE Analytical Instruments 2006 DLM 14291 Rev A vi ...
Страница 14: ...GE Analytical Instruments 2006 DLM 14291 Rev A xiv ...
Страница 24: ......
Страница 42: ...GE Analytical Instruments 2006 DLM 14291 Rev A 4 8 Figure 4 3 NOA Back Panel ...
Страница 52: ......
Страница 72: ......
Страница 84: ......
Страница 118: ...GE Analytical Instruments 2006 11 6 DLM 14291 Rev A ...
Страница 124: ......
Страница 142: ......
Страница 160: ...GE Analytical Instruments 2006 13 18 DLM 14291 Rev A ...
Страница 168: ......
Страница 184: ......
Страница 200: ...GE Analytical Instruments 2006 16 16 DLM 14291 Rev A ...