![GE MOA 280i Скачать руководство пользователя страница 191](http://html.mh-extra.com/html/ge/moa-280i/moa-280i_operation-and-maintenance-manual_128401191.webp)
GE Analytical Instruments ©2006
16-7
DLM 14291 Rev. A
Vacuum Pump
Make sure that the main power switch on the vacuum pump is in the on position,
the power cord from the pump is securely plugged into the rear of the NOA and
the vacuum hose connections to the NOA and Hopcalite trap are secure.
Cooler Temp
Make sure that sufficient time has been given to allow the cooler to reach
temperature if the NOA’s power has been off. It may take 15-20 minutes for the
cooler to reach –12 °C. If the cooler is not cooling, check the electrical
connections to the cooler. The NOA may also fail this test when cooler
maintenance is required.
Supply Pressure
Make sure that the oxygen tank contains gas, the main valve is turned on and the
outlet pressure on the regulator is set to > 6 psig. If an E size cylinder and flow
controller are being used, make sure the tank is on and the flow controller is set
to a non-zero flow. Also check the tubing from the oxygen tank to the oxygen inlet
at the rear of the NOA and check that the oxygen supply regulator at the rear of
the NOA is adjusted.
PMT Signal
There are several reasons why the NOA may fail the PMT test including a light
leak, a blown fuse for the ozone generator, a dirty reaction cell or problems with
the PMT or electronics. A light leak will be indicated by a higher than usual PMT
signal in the Status screen (see Light Leak Test, page 15-10). In some cases, it may
be possible to get the NOA to pass this test by connecting a NO calibration gas to
the sample inlet (or by blowing into the sample line). If supplying a high NO
sample allows the NOA to pass the test, the reaction cell may need cleaning.
If there is no change in the PMT signal with and without ozone, the ozone fuse may
be blown. To check the ozone fuse:
Содержание MOA 280i
Страница 6: ...GE Analytical Instruments 2006 DLM 14291 Rev A vi ...
Страница 14: ...GE Analytical Instruments 2006 DLM 14291 Rev A xiv ...
Страница 24: ......
Страница 42: ...GE Analytical Instruments 2006 DLM 14291 Rev A 4 8 Figure 4 3 NOA Back Panel ...
Страница 52: ......
Страница 72: ......
Страница 84: ......
Страница 118: ...GE Analytical Instruments 2006 11 6 DLM 14291 Rev A ...
Страница 124: ......
Страница 142: ......
Страница 160: ...GE Analytical Instruments 2006 13 18 DLM 14291 Rev A ...
Страница 168: ......
Страница 184: ......
Страница 200: ...GE Analytical Instruments 2006 16 16 DLM 14291 Rev A ...