GE PROPRIETARY
TO
GE
D
IRECTION
5308917-100, R
EVISION
8
LOGIQ P3 S
ERVICE
M
ANUAL
Chapter 3 Installation
3-3
Section 3-2
Receiving and Unpacking the Equipment
When a new system arrives, check that any components are not damaged and are not in short supply.
If shipping damage or shortage occurs, contact the address shown in Chapter 1.
The Packaging/Unpacking Procedure.
Topics discussed in the Packaging/Unpacking Procedure:
1.) Check the Shipment
2.) Unpack the Unit
3.) Handling Incomplete or Damaged Shipment
Please read these procedures before packing/unpacking the LOGIQ P3.
We strongly advice you to store the LOGIQ P3 packing material in undamaged condition in case of
future transportation.
1.) Cut the two Metal Bands.
CAUTION
Do not lift the unit by the Keyboard. This may cause equipment damage.
CAUTION
The crate with the LOGIQ P3 weighs approximately 80 kg. Be prepared for a sudden shift of
weight as the unit is removed from its base (pallet).
CAUTION
Inspect the Shcik watch and Tilt watch. Ensure that they are not fused. (Refer to the instructions
attached on the packing Box on howto check the Shcik watch and Tiltwatch)
Figure 3-1 Cutting the two metal bands.
Содержание LOGIQ P3
Страница 2: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 1 2 ...
Страница 9: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL vii ...
Страница 98: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 3 32 Section 3 10 Paperwork ...
Страница 194: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 7 26 Section 7 6 Troubleshooting ...
Страница 294: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 8 100 Section 8 14 Loading Software ...