GE PROPRIETARY
TO
GE
D
IRECTION
5308917-100, R
EVISION
8
LOGIQ P3 S
ERVICE
M
ANUAL
8-84
Section 8-10 - Power Cable
Section 8-10 Power Cable
8-10-0-1
Tools
•
None
8-10-0-2
Needed Manpower
•
1person, 15 minutes
8-10-0-3
Preparations
•
Shutdown the system and switch off the main Circuit Breaker at the bottom rear side of the system.
8-10-0-4
Removal Procedure
1. Pull the metal clamp upwards.
2. Remove the power cable as shown in the Figure below.
Figure 8-90 Power Cable
8-10-0-5
Mounting procedure
1.) Install the new parts in the reverse order of removal.
Part Number
Description
2365882
Power Cord India
5248395
Power Cord China
5248396
Power cable Europe
5248393
Power cable Japan
5248394
Power cable America
5390874
Power cable Brazil
5398510
Power cable Israel
5182816
Power Cord UK/HK
5182940
Power Cord Italy
5182083
Power Cord Denmark
5182235
Power Cord Switzerland
Содержание LOGIQ P3
Страница 2: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 1 2 ...
Страница 9: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL vii ...
Страница 98: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 3 32 Section 3 10 Paperwork ...
Страница 194: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 7 26 Section 7 6 Troubleshooting ...
Страница 294: ...GE PROPRIETARY TO GE DIRECTION 5308917 100 REVISION 8 LOGIQ P3 SERVICE MANUAL 8 100 Section 8 14 Loading Software ...